Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    In - Pit Crushing and Conveyor Transportation of Coal at Ulan

    Initial coal production at Ulan was solely from underground mines. A significant increase in demand for steaming coal in the late 1970's emphasised the need to further expand production and led t

    Jan 1, 1985

  • AUSIMM
    Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocks

    By S Utili, A Agosti

    The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each

    Nov 29, 2022

  • AUSIMM
    Risk assessment of iron mineral resources using conditional simulations

    By W Patton

    Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a

    May 24, 2023

  • AUSIMM
    Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!

    By R Price, B H. Miller

    "The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f

    Nov 15, 2016

  • AUSIMM
    Monitoring Sb in lead refining using advanced techniques in Industry 4.0

    By S Zummar, A Van den Bulck, T De Staercke, T Van Rompaey

    An increase of 22 per cent in lead usage is expected in the European Union by 2050. During lead refining, the Harris process is a critical step in which a salt melt is used to remove arsenic, tin and

    Aug 21, 2024

  • AUSIMM
    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • AUSIMM
    Comparison of One Stage and Two Stage Classification ù A Case Study

    By M N. Mian

    The Cayeli volcanogenic massive sulphide deposit is located in Black Sea region of Turkey. Cayeli Bakir Isletmeleri (CBI) was formed as a joint venture between Inmet (Canada) and Eti Holding (Turkey).

    Jan 1, 2003

  • AUSIMM
    The Frieda River Project – a Novel Approach to Analysing Exploration Drill Core: How Broken is Broken?

    By D La Rosa, D Bennett

    "Exploration drill core provides for a number of standard measurements essential for determining the viability of a new mine or the extension of an existing one. Rock lithology and alteration can be v

    Jun 15, 2016

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Data Mining Mining Data - Ordered Vector Quantisation and Examples of its Application to MIne Geotechnical Data Sets

    By B L. Dickson, E, M F. Lee, P A. Mikula

    Computational techniques are needed to assist in the analysis and interpretation of the increasing amounts of geoscientific and mining related data and information that are routinely gathered at mine

    Jan 1, 2006

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    Seamarc II Seafloor Mapping System Seven Years of Pacific Research

    Developed and built in 1982 for simultaneous bathy-metric and reflectivity mapping of the deep ocean by the Hawaii Institute of Geophysics, SeaMARC II was a breakthrough in sea-floor mapping technolog

    Jan 1, 1990

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Chamfered backs to improve open stope stability in poor ground conditions

    By G Capes

    A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann

    Mar 29, 2023

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021