Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • AUSIMM
    Information Systems in the Northern Territory Department of Mines and Energy

    By M Coleman

    Information is a key ingredient for successful mineral exploration and development. Whether identifying potential exploration localities from a map, interpreting technical reports or searching a reg

    Jan 1, 1994

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Introducing deep learning and interpreting the patterns – a mineral deposit perspective

    By I Sucholutsky, D M. First, D Mogilny, F Yusufali

    Machine learning is creating value in all facets of the mining industry, from exploration to production. The authors provide an accessible, high-level introduction to artificial intelligence (AI), mac

    May 24, 2023

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Final Session

    The seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res

    Jan 1, 1973

  • AUSIMM
    Estimation of Rock Load for Tunnels with Different Disturbance Factors

    By J Rostami, T Afshar, M Sharifzadeh

    Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the

    Sep 17, 2014

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB Kiruna

    By M J. Thurley, M Wimmer

    To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa

    Aug 24, 2015

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Thin spray liners for face support at Kanmantoo

    By B Roache

    Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers

    Mar 29, 2023

  • AUSIMM
    World Copper Demand in 2050

    For the mineral industry, sustainability seems to mean socially positive and ecologically neutral mineral extraction. Mines are financed and developed in response to demand for their products. The pur

    Jan 1, 2002

  • AUSIMM
    Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

    By H Wen

    LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the r

    Oct 12, 2022

  • AUSIMM
    Results of Self-Heating Tests of Australian Coals Conducted in a 16 m<sup>3</sup> Reactor

    A research and testing facility has been developed at Simtars to allow the spontaneous combustion testing of coal on a large scale. In this adiabatic reactor, the coal particle sizing is closer to tha

    Jan 1, 2005

  • AUSIMM
    Effective Contracting Through Partnering

    By Stewart R. D, Lawrence W, Youl M. J

    The trend towards contracting by major coal mining companies such as BHP Coal and MIM Ltd is examined. Reasons why this trend is occurring are discussed and the concept of partnering is examined.

    Jan 1, 1997

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013