Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fission Track Thermochronology - Reconstructing the Thermal and Tectonic Evolution of the Crust

    Fission track thermochronology is a well established method for reconstructing the thermal histories of rocks with particularly important applications in tectonic studies, detecting low-grade thermal

    Jan 1, 1990

  • AUSIMM
    The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.

    By Howell M. W

    The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a

    Jan 1, 1940

  • AUSIMM
    Processing of Iron Ore Using Methane-Containing Gas

    By O Ostrovski

    Iron ore reduction and iron cementation by CH4-H2-Ar gas was investigated in a laboratory isothermal fixed bed reactor. Iron ore was first reduced to metallic iron by hydrogen, then carburised to ceme

    Jan 1, 2000

  • AUSIMM
    Product Quality Control at Blackwater Coal Mine

    Utah Development Company operates a mine at Blackwater with a present annual production of 4 000 000 tonnes of coking coal. Mineable seams outcropping on the company's lease are part of the Pe

    Jan 1, 1974

  • AUSIMM
    Core & Shell Pillar Recovery Stoping in Mount Isa Silver/Lead/Zinc Mine

    Mount Isa mine is the largest underground mine in Australia and is located 2,000 kilometres north-west of Brisbane. This mine has been in continuous operation since 1931 and in 1986/87 the silver/lea

    Jan 1, 1990

  • AUSIMM
    Tunnelling in Unsolidified Water Bearing Sandstone-Construction of Tsugaru Tunnel (Futamata Construction Section)

    By Kaji S

    The Tsugaru Tunnel, located on the Honshu island approach to the Seikan Tunnel, is 5,880 m long and has a "Shinkansen" cross section of 90 m2 area. The geological formation through which the tunne

    Jan 1, 1987

  • AUSIMM
    The Removal of Chloride from the Ammonium Sulphate Liquor of the Sherritt Gordon Process

    To reduce the corrosion of a stainless steel crystallizer, caused by accumulation of chloride impurity in the liquor during the crystallization of ammonium sulphate, a strongly basic anion exchange re

    Jan 1, 1976

  • AUSIMM
    Thiorea Leaching of a Refractory Gold Ore

    By Ciminelli VST

    Thiourea leaching has been applied to a refractory gold concentrate previously treated by bacterial oxidation. Following the bio-oxidation, gold has been leached in acidic thiourea solutions, under

    Jan 1, 1993

  • AUSIMM
    Milling Operations At New Broken Hill Consolidated Limited

    By Braes J. R, Neale J. R

    The New Broken Hill Consolidated Limited (NBHC) mine currently produces 1.42 million tonnes of silver, lead and zinc ore annually. All of this ore is treated by the NBHC milling ccx[plex. This pape

    Jan 1, 1983

  • AUSIMM
    Optimization of Bench blast Design with the Aid of Computer

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully- fractured zone, through a s

    Jan 1, 1992

  • AUSIMM
    Mine Owner and Explosives Supplier - Partners in Controlling the Environmental Effects of Blasting

    By Hagan T. N, Tucker A. J

    The Cumnock Open Cut Mine (COCM) is located in the Hunter coalfield in New South Wales. Five coal seams are being mined, mostly by drilling and blasting, loaders and excavators, and trucks. The ann

    Jan 1, 1995

  • AUSIMM
    Practical Aspects of Availability and Reliablity Management in a Large Open Pit Mine

    The large El Cerrejon coal open pit in north east Columbia has been developed over the last decade in a remote, entirely new mining area with hitherto unskilled inhabitants. Now over 200 pieces of hea

    Jan 1, 1991

  • AUSIMM
    Analysis of Transportation Systems in Polish Mining Industry

    By L Gladysiewicz

    This paper deals with the current situation in the mining industry in Poland. An overview of typical transport systems working in the different branches of mining is provided. The transport systems cu

    Jan 1, 2003

  • AUSIMM
    Lubrication Oil Refining

    Although a small quantity of lc,;v viscosity index ' (L.V.I.) oils are presently manufactured in. Australia, lubricating oil refining methods are assuming gxeater significance since in 1964 Austr

    Jan 1, 1962

  • AUSIMM
    The Role Of The Geoligical Survey Of Queensland In Exploratory Coal Drilling

    The Coal Section of the Geological Survey of Queensland was formed in 1950 to plan and supervise systematic diamond drilling programmes to investigate the State's coal resources. For the first

    Jan 1, 1977

  • AUSIMM
    The Generation of Minimum Search Patterns in the Optimum Design of Open Pit Mines

    By Giannini L. M

    Optimisation techniques, based on the block model, for solving the optimum pit limit problem were discussed in an earlier paper. Of the available techniques the one based on graph theory proved to be

    Jan 1, 1988

  • AUSIMM
    The Application of High Resolution Seismic Profiling in the Preliminary Assessment of Lignite Resources, South Island, New Zealand

    High resolution seismic profiling has proved a cost effective tool for defining the structure and seam geometry of Late Cretaceous-Late Miocene age lignite deposits in the South Island of New Zealand

    Jan 1, 1989

  • AUSIMM
    Key Parameter Reporting System at Mt Newman Mining

    By Fink ST

    Management requires up-to-date information on the activities of an enterprise in order to maintain control and to assist in decision-making and planning. In today's environment it is essential

    Jan 1, 1983

  • AUSIMM
    The Sydney Harbour Colliery, Balmain

    By Bahsford A

    The presence of coal in the Sydney area was confirmed in 1891 when Cremorne Bore No. I intersected cindered coal at 1 854 m. The decision to develop Sydney Harbour Colliery was based on the results

    Jan 1, 1988

  • AUSIMM
    Hydrological Prediction and Problems in Mine Planning General Report

    Research and Technical Services, Department of Mines Western Australia The nine papers received for this technical session cover a very wide range of hydrological problems in various parts of the w

    Jan 1, 1988