Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hydraulic Handling In Mining-Fully Automatic Large-Scale Test Unit On A Practical Scale (7820d56d-e8c9-4696-85e5-160c9e5556c0)The process of hydraulic transport through pipelines, world-wide well known for the trans- port of fine-grain solids is also being used to a greater extent in mining for the handling of 1rimarily c
Jan 1, 1980
-
Method of Faceline Fall Recovery and Mining Strategy Developed to Imrpoved Longwall Availability at Cook CollieryBy Adams DG
At Cook Colliery a combination of main injection of the face coal, and mining into the floor has proved successful for the recovery of faceline falls.The strategy for preventing falls relies upon a co
Jan 1, 1991
-
Metallurgical Process Development and Plant DesignBy Ritchie I, Fleay J
The key issues in the conceptualisation and testing of treatment options for gold and base metals mineral processing projects are discussed. A prerequisite of this process is the need for close int
Jan 1, 1997
-
Computer-Aided GeomechanicsThe purpose, basic data requirements and various analysis/modelling tools employed for geomechanical evaluation of mine-site conditions are overviewed. The impact and application of computer techn
Jan 1, 1983
-
Development in Ground Support Practices at ISA MineBy Thompson J
A programme of testing and evaluation has been in progress at Isa Mine for the last four years with the objectives of rationalising ground support practices, improving installation quality and increas
Jan 1, 1985
-
Instrumentation and Control in The Cobar ConcentratorThe treatment meIhods selected for the concentrator at Cobar Mines Pty. Ltd. called for a high degree of automatic control of both the grinding and flotation sections.The resulting concentrator layout
Jan 1, 1969
-
Thermodynamic Properties of Oxygen in Liquid CopperEquilibrium in the reaction H2(g) + [%0] (in liquid copper) = H2O (g) was investigated at temperatures between 1200 -and 1350°C with p(H2Oj/p(H2) ratios between 1 to 15. A semi-microbalance was u
Jan 1, 1973
-
Mine DewateringMine Dewatering for reoccupation of a flooded mine requires rehabilitation and recommissioning of shaft and sane level functions to provide safe efficient access, services and logistics, as well as
Jan 1, 1988
-
Evaluation of Blast Furnace Slag as Base Material in Road PavementsGraded macadam slag base has been used successfully by the Department of Main Roads, N.S.W., in the construction of Expressways. However, the use of graded macadam in urban conditions introduces p
Jan 1, 1979
-
The Development of a Mathmatical Model of the Lead Flotation Circuit at the Zinc Corporation LimintedA static equilibrium mathematical model of the lead,flotation circuit at The Zinc Corporation Limited is developed to permit the feasibility of applying computer control techniques to be studied. The
Jan 1, 1964
-
Direct Fuming of Zinc from Sulphide ConcentratesBy Iley J. D
The production of zinc from low grade concentrates, particularly those high in iron, has a poor economic return due to a combination of higher concentrate transport costs, increased processing costs
Jan 1, 1993
-
Future Applications of Computers in the Design and Control of Mineral Beneficiation CircuitsTwenty years of effort in developing the use of computers in the design and control of mineral treatment circuits has resulted in a sound base for future widespread application of the techniques.. The
Jan 1, 1985
-
Fine Wet Sizing, Desliming & Media RecoveryThere has been considerable attention in the literature to coarse sizing by wet and dry screening, but these methods have not proven to be applicable to the calculation of screen capacities for fi
Jan 1, 1984
-
PPP: Public-Private Partnerships in Transport Infrastructure Financing and Construction and Their Possible Application to Underground WorksTransport infrastructure constitutes, since always, an essential link between regions, countries and continents, for economical, commercial and human purposes. Permanently growing mobility needs, whic
Jan 1, 1999
-
Geotechnical and Environmental Aspects of Heap Leach Design, Operation and ClosureBy Bronson B
The geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di
Jan 1, 1994
-
The BHP Metallurgy Research FacilityBy Hart A. T, Lanigan P. G
BHP is currently undertaking research into plasma are metallurgical processing at the Central Research Laboratories (CRL), Shortland. The use of high intensity plasma arcs for melting and smelting
Jan 1, 1987
-
The Introduction and Application of Carbon-in-Pulp in a Heap Leach ProjectBy Mann LD
The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro
Jan 1, 1982
-
Effective Fine Grinding of Petroleum Pitch with Grinding AdditivesBy Hashimoto H, Arai Y, Sikong L
For utilization of solid carbonaceous materials produced in processes of cracking heavy oil, such as petroleum pitch, as powder fuel, it is necessary to develop a process for fine grinding of these
Jan 1, 1987
-
Wall Reinforcement in Open Pit MiningStressed steel cables, similar to those used in pre-stressed concrete, have been used for rock mass reinforcement, in civil engineering, for many years. This type of reinforcement has been attempt
Jan 1, 1986
-
The Role of Contractors in Open Pit MiningBy Turner W. G, Trundle R. S, Medland D. G
Contracting has evolved from basically a tradesman providing a service for an `employer' to a multi disciplined organisation providing an all compassing service for a client.Having commenced its
Jan 1, 1992