Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Slurry Pumping at Inco Metals Company (Ontario Division)

    By J. E. Lee

    "This paper describes the current practices and experiences, and discusses design parameters concerning slurry pumping at Inco Metals Company in the Sudbury District. It deals mainly with the long tai

    Jan 1, 1978

  • CIM
    An Overview of Paste and Thickened Tailings Disposal on Surface

    By Murray W. Grabinsky

    This paper considers thickening mine tailings to dense non-segregating slurry or paste for surface disposal. The driving motivation for this initiative is the elimination of ponds, reduction in contai

    Nov 1, 2002

  • CIM
    Design and Development of an Automated Uranium Pellet Stacking System

    By B. S. Riess

    A novel design for an automated uranium pellet stacking system is presented. This system is designed as a drop-in solution to the current production line to enhance the fuel pellet stacking process. T

    Aug 1, 2010

  • CIM
    Evolution of Iron-Rich Intermetallics in Aluminium-Copper 206 Cast Alloys

    By X. Cao, X. -G. Chen, K. Liu

    Due to the detrimental effect of platelet iron-rich intermetallics on mechanical properties (particularly ductility) in cast alloys, it has been essential to transform these phases into Chinese script

    Jan 1, 2014

  • CIM
    Towards Improving Gearless Mill Drive Availability

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American?s suite of specifications for gearless mill drives (?GMDs?). These specifications are based on

    Nov 1, 2011

  • CIM
    Deep roasting of nickel concentrate

    By C. Diaz, S. W. Marcuson, K. I. Burgess

    Deep roasting in fluid bed roasters is the first unit operation in Inco's "roast-reduction smelting" process for the treatment of nickel sulphide concentrates. The roaster product, a low sulphur

    Jan 1, 1994

  • CIM
    Thermal Analysis of B206 Aluminum Alloy Solidification

    By N. Haghdadi, D. M. Maijer, A. B. Phillion

    B206 is a recently-developed high-strength Al-Cu casting alloy with reduced Ti and Fe, as compared to the well-known AA 206 alloy, for improved hot tearing resistance. In the current study, the solidi

    Jan 1, 2014

  • CIM
    Moisture Effect on CO Oxidation over Supported Gold Catalysts

    By Masakazu Daté

    Moisture effect has been studied for the CO oxidation over Au/TiO2, Au/Al2O3 and Au/SiO2, in the range of H2O concentration over four orders of magnitude. It has been found that the catalytic activity

    Oct 1, 2003

  • CIM
    Direct Application of Phosphate Rocks and Glauconite as Alternative Sources of Fertilizer in Argentina

    By Selvia Tourn, Liliana Castro

    "Abstract - Argentina, a large country with an important agriculture industry, needs an ever-increasing amount of phosphorus and potassium, as essential elements for plant growth. Current requirements

    Jan 1, 2003

  • CIM
    Revenue Mill Optimization Study

    By D. G. Cerigo

    "INTRODUCTIONAn interim report covering an uncompleted project on revenue mill optimization was presented at the invitation of Mr. C.S. Stevens, the Secretary of the Canadian Gold Metallurgists. The w

    Jan 1, 1967

  • CIM
    Eskay Creek Flotation Mill

    By Garry Biles, Ken Major, Raj Anand

    "Prime Resources Group Inc. (Prime) commenced the Eskay Creek Mine operations in 1994 in northern British Columbia. The ore from the underground mine is crushed and shipped to smelters in Japan and Ca

    Jan 1, 1998

  • CIM
    Automatic Control of Free Cyanide at Yvan-Vézina Plant

    By S. Caron, M. Bourassa, J. Châteauneuf, L. Tardif

    "Since many years, the Yvan-Vézina gold plant custom mills and processes different ore types that show different behaviors. Because of this, cyanidation control is more complex than for a typical mill

    Jan 1, 1998

  • CIM
    Numerical Modelling of Rock Fracture with the Embedded Discontinuity Approach Incorporating Heterogeneity

    By T. Saksala

    In this paper, the embedded discontinuity approach is applied to finite element modeling of rock fracture. A rate-dependent constitutive model based on the embedded displacement discontinuity theory i

    Jan 1, 2015

  • CIM
    Safe Rapid Drifting ? Water Jet Scaling

    By Paul G. Dunn

    Safe rapid drift development results principally in reducing exposure of underground workers to the working face. This reduction in exposure is not achieved until either the rock walls have been suita

    May 1, 2004

  • CIM
    Arntfield Mine

    By E. A. Hart, J. E. Gill

    "The property of Arntfield Mining Corporation, formerly Arntfield Gold Mines, Limited, covers an area of 2,110 acres and lies in Beauchastel township, western Quebec. The Francoeur mine lies to the we

    Jan 1, 1954

  • CIM
    Gold Deposits: Establishing Sampling Protocols and Monitoring Quality Control

    By Dale A. Sketchley

    "Abstract - Large differences in gold content between rock fragments or small volumes of unbroken rock, commonly referred to as the nugget effect, are related to sample and subsample weights, crushing

    Jan 1, 1998

  • CIM
    Effect of Grain Size on the Texture Evolution and Anisotropy of Mechanical Behavior of Rolled WE43 Magnesium Alloy at High Strain Rate Conditions

    By H. Asgari, A. G. Odeshi, J. A. Szpunar

    In the current research, the role of grain size on the texture formation and mechanical behavior of rolled AZ31B Mg alloy is investigated under shock loading conditions. The grain size of the original

    Jan 1, 2014

  • CIM
    Development of a High Strength Total Tailings Paste Fill Using Fine Sulphide Mill Tailings

    By Laxman M. Amaratunga, Glen G. Hein

    "Most mining operations utilize the tailings coarse fraction for backfilling while the fines have been traditionally disposed on surface in tailings ponds. Recently, paste fill has been developed whic

    Jan 1, 1997

  • CIM
    PEC uranium deposit Hornby Bay Basin, Northwest Territories

    By C. M. Trigg

    "PEC uranium deposit, 100 km southwest of Coppermine, was discovered by diamond drilling in 1976 following ground and airborne geophysical surveys, geological mapping, geochemical surveys and boulder

    Jan 1, 1986

  • CIM
    An Evaluation of a High Gradient Magnetic Separation Pilot Plant at Brunswick Mining and Smelting

    By Jan E. Nesset, L. Paul Staples

    "High Gradient Magnetic Separation (HGMS) technology, although developed over 2 decades ago, has not been widely applied to the separation of sulphide minerals. Under conditions of strong magnetic fie

    Jan 1, 1996