Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ultrasound Use in Copper-Nickel Sulphide Flotation

    By Yum Xiaoquan, Turgut Yalcin

    "A laboratory study was carried out to determine the potential role and effect of ultrasonic irradiation in the flotation of a Sudbury copper-nickel sulphide ore. The use of ultrasound was tested sepa

    Jan 1, 2005

  • CIM
    LNG Fuelling for Mine Trucks

    By Brad E. Melanson

    Because mine haul trucks consume considerable quantities of fuel, they are ideal candidates for the adoption of cleaner and cheaper fuels like natural gas. Impressive fuel cost savings will be realize

    May 1, 2006

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element Approach

    By S. Stefanizzi

    In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used

    May 1, 2009

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005

  • CIM
    A Method to Assess Size Reduction by Grinding

    By Daniel Hodouin, Claude Bazin

    "A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t

    Jan 1, 2004

  • CIM
    Iron and steel making in the third millennium

    By J. P. Sancho, L. F. Verdeja, J. I. Verdeja

    "This paper analyzes the present state of the different processes competing to keep their market shares within the future iron and steel business sector.The continuous transformations in the steel mak

    Jan 1, 2002

  • CIM
    Energy/GHG Management Assessment Using TSM Indicators

    By Lauri Gregg

    Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management

    May 1, 2007

  • CIM
    Fuelcell Versus Diesel Loader Operation: Cost-Benefit Analysis Study

    By Marc C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuelcell vehicles, a broadscoped project was initiated to quantify the costs associated with operating fuelcell vehicles and d

    May 1, 2003

  • CIM
    Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario

    By A. C. Wilson

    In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu

    May 1, 2003

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    Effect of Pulp Temperature on Copper and Gold Collectors at Hudson Bay Mining and Smelting

    By Karl Hoover, Cassandra Spence, Brent Bachewich, Jaakko Levanaho

    "Since year 2000 the gold recovery into copper concentrate at Hudson Bay Mining and Smelting has reduced considerably during the summer months. This initiated a testwork program in the fall 2003 to fi

    Jan 1, 2005

  • CIM
    Hydraulic versus cable in 1988

    By Brian Reid

    "This paper studies the progress made by hydraulic shovel manufacturers over the last few years, particularly in the areas of productivity increase and operating cost reductions.Five years ago, it was

    Jan 1, 1988

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013