Framework for Risk-Based Electric System Deep Foundation DesignBy Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Piles through Soft Clay for a Metro ProjectBy Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese
"Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar
Jan 1, 2015
-
Harry Nice Bridge Geotechnical Instrumentation Case StudyBy Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.
Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans
Oct 1, 2022
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of AntwerpBy Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single PierBy Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi
The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines
Jan 1, 2019
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Nearshore Pile Construction Experience In Burnie, TasmaniaBy Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling ProgramBy Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as
-
Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case HistoryBy Sunil Arora, Lisheng Shao, Chris Conkle
"The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count
Jan 1, 2015
-
Study on a Method for Determining the Proper Cover Soil Depth for Cement Ground Improvement in Cold RegionBy Masahiko Yamaki, Takahiro Yamanashi, Hijiri Hashimoto, Hirochika Hayashi
"In this study, the authors used heat conduction analysis with the aim of quantitatively evaluating whether treating improved ground with cover soil is an effective measure for maintaining strength de
Jan 1, 2015
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled ShaftsBy Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, PaBy Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv
Jan 1, 2013
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022