Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Framework for Risk-Based Electric System Deep Foundation Design

    By Steve Davidow, Ashely E. Evans, Peter M. Kandaris

    "Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation

    Jan 1, 2017

  • DFI
    Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution

    By Filippo Maria Leoni, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co

    Jan 1, 2017

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR

    By Vince Luongo

    "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project

    Jan 1, 2006

  • DFI
    Rock Socketed Drilled Shafts for the Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of

    Jan 1, 2016

  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Harry Nice Bridge Geotechnical Instrumentation Case Study

    By Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.

    Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans

    Oct 1, 2022

  • DFI
    Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp

    By Stefan Mewes

    Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa

    Sep 1, 2022

  • DFI
    Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single Pier

    By Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi

    The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines

    Jan 1, 2019

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    Alternative Design and Construction Method for Clinton CSO Underground Storage Facility

    By Meeok Kim, Paul Beljan, Gordon Chen

    "Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct

    Jan 1, 2015

  • DFI
    Nearshore Pile Construction Experience In Burnie, Tasmania

    By Thomas W. Scott, Manh N. Tran

    Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur

    Nov 1, 2022

  • DFI
    Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling Program

    By Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as

  • DFI
    Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case History

    By Sunil Arora, Lisheng Shao, Chris Conkle

    "The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count

    Jan 1, 2015

  • DFI
    Study on a Method for Determining the Proper Cover Soil Depth for Cement Ground Improvement in Cold Region

    By Masahiko Yamaki, Takahiro Yamanashi, Hijiri Hashimoto, Hirochika Hayashi

    "In this study, the authors used heat conduction analysis with the aim of quantitatively evaluating whether treating improved ground with cover soil is an effective measure for maintaining strength de

    Jan 1, 2015

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017

  • DFI
    The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling

    By Frank J. Purcell

    “Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou

    Nov 1, 2022

  • DFI
    Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, Pa

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv

    Jan 1, 2013

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022