    Session 29 "Grouting for Tunnels 1"

    By Lynn Crayne

    We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the

    Feb 10, 2003

  • DFI
    Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground Metro

    By Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani

    With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s

    Nov 1, 2022

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier Walls

    By R. Lee Wooten, David R. Shields, Darren D. Clark

    "Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con

    Jan 1, 2016

  • DFI
    Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s Perspective

    By A. David Miller, Chika Oya

    "Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi

    Jan 1, 2017

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022

  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles

    By Venugopal Bonani, Kumaran M., Thomas John

    Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a

    Sep 1, 2022

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality Control

    By Franz-Werner Gerressen

    New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su

    Jan 1, 2019

  • DFI
    Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive Strength

    By Dominic Parmantier, Jason Page

    "In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c

    Jan 1, 2015

  • DFI
    Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila

    By Benjamin B. Buensuceso III

    Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is

    Sep 8, 2021

  • DFI
    Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii

    By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.

    The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris

    Nov 1, 2022

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)

    By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan

    The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due

    Sep 1, 2022

  • DFI
    Pile Foundations For Algiers New Airport Terminal

    By Ramdane Bahar

    The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea