Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Response of Un-Cracked Drywall Joints and Sheets to Blast Vibration and Weather

    By Jeffrey Meissner, Charles Dowding

    Cracking is one of the concerns cited by owners of structures adjacent to construction or mine blasting. During the past decade a large number of measurements have documented the low level of crack re

    Jan 1, 2011

  • ISEE
    Underwater Blast Pressures From A Confinded Rock Removal During The Miami Harbor Deepening Project

    By Terri Jordan, Gregory Hempen, Thomas Keevin

    Water-borne blast pressures from confined blasts were recorded as part of a submerged blasting program in Florida for channel deepening. The blasting was confined within the rock floor by stemming. Sh

    Jan 1, 2007

  • ISEE
    Social Cost Benefit Analysis of Alumized ANFO

    By Gordon Lovegrove, Jeffrey Leob, Dwayne Tannant

    It has long been known that the combination of aluminum (AL) powder to ammonium nitrate (AN) / fuel oil (FO) can greatly enhance fragmentation or ultimately reduce the number of blast holes in a patte

    Jan 1, 2011

  • ISEE
    Blasting for Rescue Applications

    By John Norman

    This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.

    Feb 1, 2020

  • ISEE
    Mitigation of Accelerations on Vehicles Subjected to Buried Mine Loading

    By Jarrod Bonsmann, Zachary T. Plitt

    "A surge in mine related deaths in Middle Eastern conflicts over the past few years has prompted research into the mitigation of the impact on a blast loaded vehicle. In past military conflicts, it ha

    Jan 1, 2016

  • ISEE
    TNT Equivalence and Fragmentation Mechanisms of High Pressure Gas Fracturing Technique

    By Baohua Guo, Xuelin Yang, Tingkan Lu, Hailin Sun

    The work presented in this paper mainly involves two parts. Firstly, the fundamental characteristics of the high pressure carbon dioxide gas fracturing technique (CO2 technique), including, a proposed

    Jan 1, 2017

  • ISEE
    Journal: Blast Vibration and Seismograph Section / A History of the Development of Instruments for Measuring Vibrations of the Earth / Part 4

    By Robert Hopler

    Although electrical instruments were being widely introduced into the study of seismic tremors, attempts to understand and quantify shocks from blasting continued to use rather primitive methods well

    Jan 1, 2007

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis Davidsavor, David Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

  • ISEE
    Evaluation Of Suitability Of Permitted Delay Detonators Vis-avis Their Delay Timing For Use In Underground Coal Mines

    By Harsh Kumar Verma

    Blasting off-the-solid is the most commonly used method during development of galleries in Bord and Pillar method of underground coal mining. In this method, only P5 explosives are used with permitted

    Jan 1, 2008

  • ISEE
    European Explosives Qualifications – The Euexcert Project

    By H. Wallin, I. G. Wallace, J. Akhavan, E. Nilsson

    Over the past three years the UK together with Sweden, Norway, Finland, Italy have been taking part in a EU funded Leonardo da Vinci programme. More recently EFEE have participated in the project know

    Jan 1, 2008

  • ISEE
    Drilling and Blasting with Large Equipment: Sustainable Mining Near Communities

    By Mattos J. L. C

    Drilling and blasting with explosives in mining operations near communities require careful planning to mitigate socio-environmental impacts. Ground vibration, noise emission, flyrock, and dust disper

    Jan 26, 2026

  • ISEE
    Global Implementation of Track and Trace Solutions and Challenges for Manufacturers

    By TTE-Europe GmbH

    A few years ago, the term Track & Trace for explosives was only known in Europe and Brazil at most; the introduction of this technology is experiencing an undreamt-of boom worldwide. More and more cou

    Jan 26, 2026

  • ISEE
    Rock Fragmentation Prediction Using Machine Learning

    By Ankit Jha, RICHARD AMOAKO

    In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th

    Feb 1, 2020

  • ISEE
    Electronic Detonator Easy to Implement: No Longer a Myth

    By Laurent Airaud

    For around ten years, electronic detonators are available for those who want to use advanced methods and to apply theories promoted by engineers and professors to reduce blast concerns or improve frag

    Jan 1, 2004

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    A Reanalysis of Fragmentation Data from the Red Dog Mine - Part 2

    By Norman Paley, Finn Ouchterlony

    Detailed fragmentation data for different blast delay timing tests at the Red Dog mine in Alaska are analyzed. This work is a continuation of previous work in which the crusher output was found to be

    Jan 1, 2013

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Blast Vibration Monitoring, Prediction and Control at Old Cliffe Hill Quarry

    By Rob Farnfield, Mark Pegden

    Old Cliffe Hill quarry produces between 4 and 5 million tonnes of crushed granite per year and is located in the county of Leicestershire in the East Midlands region of England. Blasting is carried ou

    Jan 1, 2010