Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cu-Removal From The Skorpion Circuit Using Emew® TechnologyBy I. Ewart, E. Roux
Skorpion Zinc operates a solvent extraction/electrowinning zinc plant producing over 150 000 t/a of special high grade (SHG) zinc (>99.995% Zn). In the current flow sheet copper and cadmium are cement
Jan 1, 2007
-
Some Benefits Arising From The Establishment Of A Mining Infrastructure Prior To The Commissioning Of The ShaftBy H. C. de Wet
The predevelopment and preparation of a total infrastructure in a deep level mining environment, prior to the shaft system being commissioned has major advantages. This paper intends to indicate these
Jan 1, 1997
-
Atmospheric Oxidative and Non-Oxidative Leaching of Ni-Cu Matte by Acidified Ferric Chloride SolutionBy L. M. Sekhukhune
The atmospheric leaching of copper-bearing matte by acidic ferric chloride solution was studied at the laboratory scale. The aim was to achieve maximum copper and nickel recovery by investigating the
Jan 1, 2014
-
Cyanide Control In The Metallurgical Process Of Gold Extraction In AngloGold (S.A.)By B. J. Vorster
AngloGold South Africa region currently consists of twelve gold plants. These plants use a combined total of $20 million of cyanide per annum. Of this, the major portion (60%) is consumed at two Ergo
Jan 1, 2001
-
From C.Z.O. To Zinc Cathode Without Any Pre-Treatment. The Ezinex ProcessBy M. Olper
The zinc recycling is assuming more and more importance. A lot of zinc secondaries and wastes are ready to be collected and converted to zinc metal. The impurities present in these materials and the t
Jan 1, 2008
-
Information As An Alternative To Mineral Rights TaxationA new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter
Jan 1, 1999
-
Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc FurnaceBy W. Banda
Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red
Jan 1, 2004
-
Recent Developments In Physico-Chemical Characterization And Modelling Of Ferroalloy Slag SystemsRecent studies on the physico-chemical properties of molten slags and oxide solid solutions of interest are reviewed. The review covers redox and phase equilibria in slags, viscosity, diffusivity, ele
Jan 1, 2004
-
Time-Dependent Tunnel Deformation At Hartebeestfontein MineBy J. D. Bosman
The problems associated with squeezing rock conditions in tunnels are well known and have been extensively investigated in the past. Although squeezing conditions are predominantly found in tunnels de
Jan 1, 2000
-
Investigation Of The Influence Of An Excavation On Adjacent Excavations, Using Neural NetworksBy S. Kwon
When an underground excavation is created near to an instrumented measuring location, deformation at the location increases. The characteristics of this deformation increase, as well as the duration o
Jan 1, 1998
-
Mineralogy of detrital monazite from the Sibaya Formation, KwaZulu-NatalBy R. B. August, J. N. Dunlevey
The Quaternary Age aeolian dune sands of the Sibaya Formation on the northern KwaZulu-Natal coast are well known for their heavy mineral content. Although ilmenite, rutile and zircon are the economica
Jan 1, 2003
-
Commitment, Compliance And Capacity - How Environmental, Safety, Security And Social Financial Issues Affect Lenders? Risk (Project Evaluation Conference Melbourne, Vic, 19 - 20 June 2007)By G. A. Brown
Major mining projects are developed with the assistance of lending institutions who provide hundreds of millions of dollars in funding over several years, and of course expect those funds to be return
Jan 1, 2007
-
Iron slag dump material and leachate treatmentBy A. C. Moorgas, J. Divall
This study investigates the feasibility of using waste iron slag, the by-product from a mineral sands processing works, in road construction. The study includes the different options investigated for
Jan 1, 2003
-
CFD modelling of methane movement in minesBy D. Whittles, C. J. Lea, T. X. Ren, A. Kelsey
A methodology for the simulation of methane drainage combining geotechnical modelling and computational fluid dynamics (CFD) will be described. Geotechnical modelling was used to predict the developm
Jan 1, 2003
-
Viscoplastic behaviour of and damage to rock related to the design of underground waste depository cavitiesBy A. Bouvard, N. Hoteit, E. Boidy, F. Pellet
In the context of the construction of an Underground Research Laboratory devoted to the feasibility studies of radioactive waste deposits, it appears of the utmost importance to study the long-term be
Jan 1, 2003
-
VAT and professional servicesBy Ian MacKenzie
Over the past twelve years, professionals such as architects, engineers, accountants, and attorneys have not had to pay a great deal of attention to GST. The fees charged to clients (outputs) have no
Jan 1, 1990
-
The effect of resin annulus on anchorage performance of fully encapsulated rockboltsA diverse selection of rockbolt designs and resin anchors are available for use in underground mines. Research in recent years at the UNSW Mining Research Centre led to the construction of a rockbolt
Jan 1, 2003
-
A study of internal overburden dump design and stability analysis for Hazelwood Power Mine, Latrobe Valley, Victoria, AustraliaBy D. Nag, J. Fernando
Hazelwood Power Mine is one of the largest open pit brown coal mines in Australia. The removal of overburden is the first step in coal winning operation. The primary aim of construction of overburden
Jan 1, 2003
-
The abatement of pollution from abandoned gold-residue damsBy J. A. Caldwell, G. E. Blight
The metropolitan area of the Witwatersrand has grown up around the Witwatersrand gold mines. Most of the mines have now been abandoned, but deposits of waste material remain and have been surrounded,
Jan 1, 1983
-
Estimation of optimum exploitation life of a bucket wheel excavator: Through the prism of dynamic programmingBy R. Zivojinovic, S. Vujic, T. Tanaskovic
The problem of determining the optimum exploitation life of machinery, namely the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Ta
Jan 1, 2003