Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computer-Assisted Layout Of In-Pit Crushing/Conveying SystemsBy J. E. Lonergan
The in-pit placement of crushing and conveying equipment results in a flattening of the pit slope of a multiple-bench open pit mine. To maximize the economic benefit of lower haulage costs associated
Jan 1, 1985
-
Offshore Prospecting And Mining Laws Of The United StatesBy J. L. Goodier
The paper points up the hesitance of private capital to pursue development of offshore mineral mining endeavors due to the deterrent effect of the clouded legal status of such endeavors. Some states
Jan 1, 1968
-
Dust Control At Gouverneur Talc Company, Inc.By G. R. Erdman
The industrial mineral filler plant of the Gouverneur Tale Company is equipped with a good dust collection system installed long before the recent popularization of environmental pollution. Credit for
Jan 1, 1972
-
Effects of Cover Depth on Ground Movements Induced by Shallow TunnellingBy Johan Bosch, Wout Broere, Minh Ngan Vu
"INTRODUCTION Shield tunnelling is often used in constructing underground infrastructure in cities due to the ability to limit settlements and damage to existing buildings. However, in an urban enviro
Jan 1, 2016
-
Carrying Coal To The 21st Century: The ICG/Hoosier Energy ContractBy Robert J. Neubauer
I was asked here today to discuss the first long-term freight rate contract ever signed by a U.S. railroad and shipper. That was ICG's contract with the hoosier energy company to haul coal from s
Jan 1, 1981
-
Adsorption Of Gold From Iodide Solution Onto Activated CarbonThe adsorption of gold onto activated carbon in iodide solutions has been studied. The adsorption rates were determined as a function of temperature, salt concentration and pH as well as activated car
Jan 1, 1993
-
The Coal Quality Expert: Introduction To The Acid Rain Advisor (beae044d-7b5d-4d01-8abc-f3b7c00f313b)By C. D. Harrison
The 1990 Clean Air Act Amendments specify national objectives for reducing sulfur dioxide emissions from coal-fired power plants System-wide reductions can be achieved by combining various emissions c
Jan 1, 1992
-
Land Management And Environmental Quality: A Decade Of Experience With SMCRA The Experience Of The Eastern Coal IndustryBy G. E. Slagel
On August 3, 1987, a hearing was held by the House Subcommittee on Energy and the Environment to commemorate the tenth anniversary of the Surface Mining Control and Reclamation Act (SMCRA). Four panel
Jan 1, 1988
-
Corrosion Strategies at the Resolution Copper Project, Arizona - SME Annual Meeting 2024By Gabino Preciado, Louis Sandbak
Corrosion has long been identified as a potential risk to the long-term ground support stability due to degradation of internal ground support elements such as rock bolts but also to surface support f
Feb 1, 2024
-
The Discovery, Evaluation And Development Of Gold Occurrences At The Dome Mine, South Porcupine, Ontario A Working Model For Archean-Type Deposits (c21bce17-a05e-43f5-b8d3-3cb50557677e)By Dean S. Rogers, R. A. Metz
The conventional role or exploration, development and grade control is examined in this paper within the context of the many and varied types of gold occurrences which are found at the Dome Mine. The
Jan 1, 1992
-
Rubber And Its Contribution To The Economic Solutions Of Industry's Environmental ProblemsBy Henry H. Rubin
Rubber and its contributions to the economic solutions of environmental problems in the minerals industry. The intelligent applications of "Rubber" to systems of noise abatement, vibration isolation
Jan 1, 1979
-
Solving The Flocculation ProblemBy M. P. Corriveau
This is the case history of how two nearby plants in Southwest Virginia solved their water clarification problems. While the solutions should not be considered applicable industry-wide, the methods us
Jan 1, 1960
-
The Cerrejon North Coal Project In Columbia ? BackgroundBy B. N. Everett
The growing role of Colombia as a major supplier of internationally traded steam coal has been widely discussed in the industry. Although Colombian coal has been produced and exported in small quantit
Jan 1, 1986
-
Dewatering Of Ultrafine Coal By FiltrationBy Z. Yu
Dewatering of a -0.5 mm fine coal has been studied extensively. Deep cleaning requires however fine grinding, and dewatering of such ultrafine products presents a great challenge. Several coal samples
Jan 1, 1994
-
Noise Levels and Controls in Coal Cleaning PlantsBy Terry L. Muldoon
On July 7, 1971, noise regulations for underground coal mines were implemented under provisions set forth in the Federal Coal Mine Health and Safety Act of 1969. These same regulations now also apply
Jan 1, 1972
-
Discovery Of The Silver Creek Molybdenum Deposit Rico, ColoradoBy Larry F. Barrett
Anaconda exploration in the Rico mining, district from 1978 through early 1983 resulted in discovery and partial definition of the Silver Creek molybdenum deposit. Approximately 44 million tons of 0.3
Jan 1, 1985
-
Reserves, Resources And Pie-In-The-Sky ? IntroductionBy Kenneth A. Grace
Each and every mining operation from a simple sand-and-gravel pit to the largest integrated mine-mill-concentrator-smelter-refining complex has, as its foundation, a quantity of extractable natural re
Jan 1, 1983
-
Economico-Mathematical Analysis Of Transition From Open-Pit To Underground MiningShallow ore deposits are mined by surface methods but a depth is reached in the case of most deposits after which underground methods are applied for the extraction of the remaining ore. The determina
Jan 1, 2010
-
Influence Of Step Changes In Operating Conditions On Batch Flocculation Of Mineral FinesBy Sureshan K. Moothedath
This paper provides a mechanistic representation for floc formation, growth and degradation and presents results from an experimental study of batch flocculation in which step changes were made in the
Jan 1, 1993
-
Breaking Through: Shaft Design and Construction Considerations from Miami’s Norris Cut ProjectBy Richard Giffen, Boris CARO VARGAS, Terrence Carroll
"This paper takes an in-depth look at the $72 million design-build Norris Cut project, which includes the replacement of an existing 54-inch waste water sewer main to Fisher Island under the Norris Cu
Jan 1, 2016