Roof And Rib Hazard Assessment For Underground Stone Mines – Preprint 97-113By L. J. Prosser, A. T. Iannacchione
Unfortunately from 1991 through 1995, 44 miners were fatally injured in the stone industry. Of these 12 occurred at underground mines from a total work force of less than 2,000 miners. Nine of these 1
Feb 24, 1997
-
Benefits Analysis Of Expert Control SystemsBy A. Broussaud, J. D. McKay
Benefits analysis of adaptive Expert control systems operating at plants in Africa and the United States are presented. Proper statistical tools and techniques are discussed. Technical and practical
Jan 1, 2001
-
Current Concepts in Coal Export Terminal DesignBy R. W. Carn, D. Vincent
Environmental Considerations With significant increases in bulk coal movements through terminals, operators are under constant social and political pressure to reduce or remove environmental pollut
Jan 7, 1983
-
Effect of mine water on the stability of underground coal mine roadwaysBy H. Takamoto, M. Ichinose
"The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many roa
Jan 1, 2011
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Hydrothermal Silicification and Alteration of Breccias from Lucky Strike and Menez Gwen hydrothermal fields (Mid-Atlantic Ridge, Azores)By I. A. Costa, Y. Fouquet, F. Barriga
"Lucky Strike and Menez Gwen are two hydrothermally active sites located along the border of the Azorean plateau, southwest of the Azores islands where the alteration processes affecting basaltic rock
Sep 1, 2014
-
Maximizing REE Enrichment by Froth Flotation of Alaskan Coal Using Box-Behnken Design Mining, Metallurgy and Exploration (86fb0501-8584-411a-8eaa-300608562be7)By T. Gupta, T. Ghosh
Rare earth elements (REEs) and their compounds are essential in a multitude of mundane and sophisticated applications such as renewable energy technologies, catalysts, medicine, and defense applicatio
-
"SAFETY FIRST" in the development of underground mining machinesBy E. Lammer
"Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio
Jan 1, 2011
-
Soft Ground Tunneling Issues Handled by Partnering—A Win-Win Project in Rancho Cordova, CaliforniaBy Jack Magtoto, Lysa Voight, Tom Martin, John Forero
SUMMARY Commitment by all parties to partnering goals established early in the contract aided Affholder, Inc. in constructing 2,360m (7,700') of soft ground tunnel in Rancho Cordova, CA. Desp
Jan 1, 2007
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector FacilityBy Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Warm Springs Ponds: Superfund SuccessBy Harry E. Hughes
A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that
Jan 1, 1996
-
Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38By J. S. Peterson, G. P. Cole
The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll
Feb 24, 1997
-
Improving Conveyor Transfer Point Performance in Hard Rock Mines (3df8afc1-5943-4b67-9bd9-6a87144e0c1e)By R. Shields
"Hard rock mines move large volumes of material, which can cause the conveyors that are essential to this movement to suffer lots of problems, including carryback, spillage, dust and belt wander. Many
Jan 11, 2017
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Geochemical Profiling Of A Sulfide Leaching Operation: A Case StudyBy S. M. Flaherty, R. E. Scheffel, A. Guzman
Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me
Jan 1, 2006
-
Latin Mining - Goldcorp?s New Peñasquito MillBy Barry Olson
The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries to be developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acqui
Jan 1, 2009
-
Sales Comparison Valuation Of Development And Operating Stage Mineral Properties (35d10c9f-1d98-4437-8650-1c6154123f45)By T. R. Ellis
Minerals Appraisers/Valuers often find great difficulty or failure in attempting to employ the Sales Comparison Approach to the Market Value Appraisal of development and operating stage mineral proper
Jan 1, 2011
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct TunnelBy C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important StructuresBy Akihiro Higashide, Roy H. Patten
The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini
Jan 1, 1995