Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improved safety for ground support installation in narrow vein mine conditionsBy Bill Kendall
"In coal mines, handheld air, electric and hydraulic powered drills are used along belt conveyors, in single entry development, in entries where there are obstructions, and in longwall recovering bolt
Jan 1, 2014
-
Sustainable Change of Coal Mining RegionsBy J. Kretschmann
According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The
Jan 1, 2019
-
Initial Operations--Insuring The Return On Your Construction InvestmentBy L. L. Lien
In this economic age of high interest rates and softening mineral commodity markets, the mining industry is taking a hard look at how it conducts its business and where economies can be effected. Th
Jan 1, 1982
-
Navigating Operational Hurdles in SAG Mills: Identifying and Addressing Common Challenges - SME Annual Meeting 2024By Kevin Erwina, Rajiv Chandramohana, Connor Meinkea
This paper explores prevalent operational challenges encountered globally in SAG mills, including suboptimal throughput, liner wear, excessive energy consumption, and SAG mill load stability. The pape
Feb 1, 2024
-
Division Radomiro Tomic: Its Hydrometallurgical ProcessBy Richardo Montoya
Radomiro Tomic, the new CODELCO division, is a copper deposit located at 3000 m a.s.l. and 40 Km from Calama in northern Chile. It has total oxide reserves of 802,000,000 tonnes with an average grade
Jan 1, 1998
-
Eminent Domain Mineral Property Valuations: When Self-Proclaimed “Latitude” Falls Somewhere South of Competence and Ethical ObligationsBy J. M. Beck
Mineral property appraisers engaged in eminent domain actions on properties for which mining is the highest and best use must be fully competent in all phases of mineral resource estimation, mine proj
Jan 1, 2019
-
Raw Materials And The Manufacture Of Vitrified Clay Pipe In ArizonaBy Don Morris
The Building Products Company is Phoenix based and owned by Mission Clay products of California. Building Products is the only manufacturer of vitrified clay pipe in Arizona. The marketing area includ
Jan 1, 1987
-
Sustainable change of coal-mining regions (ME Technical-Paper Abstracts)By Jürgen Kretschmann
Principally, mining natural resources is a finite business that reaches its limits once the deposits mined are depleted, the resources can no longer be mined in an economically profitable way or subst
-
Phosphorus – A circular journey from the ground to the recycling lineBy Ewan Wingate, Ranjit Prasad, Yanjun Liu
The phosphorus journey begins with the extraction of primary phosphorus in the form of phosphate in apatite through openpit mining and, in some rare cases, underground mining methods. The ores are pro
Feb 1, 2024
-
Recovery Of Pyrites From Coal Refuse -- A Pilot Plant StudyBy Harold L. Lovell
The current interest in sulfur recovery from coal measures is indicated by a recent report prepared for the Public Health Service (1) It was noted that the concentration of pyrites to a product contai
Jan 1, 1967
-
Continuous Elution of Gold from Activated CarbonBy Francois J. E. Scholtz, Raymond J. Davidson, Peter Greenhalgh, R. Paul Riley
A 1 t/d continuous elution pilot plan is being operated by General Mining at their Grootvlei Gold Mine using the technology developed at the Anglo American Research Laboratories. Flowsheet design and
Jan 1, 1990
-
The New Clean Air ActBy H. Barry Holt, Charles A. Bischoff
On November 15, 1990, President Bush signed the Clean Air Act Amendments of 1990. The new legislation is sweeping in its demands for cuts in smog, acid deposition, toxic air pollutants and ozone-deple
Jan 1, 1991
-
Controlling Grinding And Classification Circuits At Climax Molybdenum Company Climax, Colorado ? Control Systems:By Richard C. Enochs
In order to clearly understand our process control system it is necessary to briefly discuss the various process control systems that were considered and why we chose our particular configuration. We
Jan 1, 1975
-
Design Of A Multivariable Grinding Circuit Control System - The Primary Grinding CircuitBy H. Melama
The primary grinding stage in the Vuonos concentrator comprises a rod mill in open circuit and a semi-autogeneous mill in closed, circuit with a hydrocyclone classifier. The instrumentation of the gr
Jan 1, 1984
-
Methane-air explosion hazard within coal mine gobs - SME Transactions 2013By J. F. Brune
This paper analyzes the explosion hazard resulting from the formation of methane-air mixtures in the mined-out gobs of underground longwall coal mines. Although direct examinations of the gob atmosphe
Jan 1, 2013
-
Geopolitical risk assessment of countries with deposits of rare earth elementsBy Sotiris N. Kamenopoulos, Zach Agioutantis
Rare earth elements (REEs) are considered critical minerals for the industrial and defense sectors. In 2018, the U.S. Department of the Interior presented the final list of critical minerals that are
-
In-House Shaft Sinking, Past And Present, At St. Joe Minerals New Lead Belt, Southeast MissouriBy Robert W. Roscoe
For over a century, St. Joe Minerals Corporation in Southeast Missouri has been sinking shafts for their lead mining operations. Upon discovery of the Viburnum Trend, or "New Lead Belt", St. Joe broug
Jan 1, 1983
-
Coal Water Slurry Fuels An Overview ? IntroductionBy Luis Pommier
In the United States, about one-quarter of the fuel oil and natural gas consumption is associated with power production in utility and industrial boilers and process heat needs in industrial furnaces.
Jan 1, 1983
-
Tailings filtration using Viper Filtration technology – a case studyBy PETER ROBINSON, KEVIN BARBER, OLIVER WHATNALL
The investigation and uptake of filtered tailings continues to grow around the world, but cost and scalability are deterrents for mining companies. Filtration technology that is currently in use is un
-
Successful Soft Ground NATM Approach on Metro Section E4B in Washington, D.C.By Peter Kolitsch, Galyn Rippentrop
INTRODUCTION On April 14, 1994, the joint venture of Kiewit Construction Company and Kenny Construction Company was awarded a 76 million dollar contract for the construction of the New Hampshire A
Jan 1, 1997