Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Development and Application of Impact-Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

    By Kevin Jinrong Ma

    Underground mines often experience roof falls in entries, crosscuts, and intersections of active mining sections, main travel ways, and belt entries. Roof fall heights greater than 20 ft (6 m) make re

    Jan 1, 2011

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • SME-ICGCM
    A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)

    By Frederick Carr

    1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote

    Jan 1, 1982

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Mining Subsidence Of An Urban Area In Ipswich, Queensland (3581bf43-8b41-4e5e-a797-55082bdbc493)

    By D. J. Maconochie

    This paper describes the investigations and results of monitoring of deformations of houses located within the area of influence of a pillar collapse over the Westfalen No. 3 coal mine near Ipswich, Q

    Jan 1, 1992

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Roof Span Design for Underground Stone Mines

    By Essie Esterhuizen, John Ellenberger, Dennis Dolinar

    "Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us

    Jan 1, 2010

  • SME-ICGCM
    Effect Of High-Extraction Coal Mining On Surface And Ground Waters

    By Francis S. Kendorski

    High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ

    Jan 1, 1993

  • SME-ICGCM
    Roof Bolter Synthetic Mesh Handling System

    By Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange

    "Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The

    Jan 1, 2010

  • SME-ICGCM
    The Contributions of the Alpha Foundation to Ground Control Research and Development

    By Tom Barczak, Julian Restrepo, Zach Agioutantis

    "The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States

    Jan 1, 2016

  • SME-ICGCM
    Influence of Roof/Floor Interface on Coal Pillar Performance

    By Kyle A. Perry

    Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des

    Jan 1, 2013

  • SME-ICGCM
    Initial Results From Implementing a Laminated Overburden Model Into ARMPS

    By Peng Zhang

    In a recent research effort, a laminated overburden loading model (as implemented in LaModel3.0 was compared with the results of ARMPS 2010, and the laminated overburden model was found to more accura

    Jan 1, 2013

  • SME-ICGCM
    A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction Method

    By Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner

    "In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari

    Jan 1, 2015

  • SME-ICGCM
    High-Precision Dynamic Subsidence Prediction Model Aided by Field Measured Data

    By Yuanfei Chen, Jianfeng Zha

    "China is the largest producer and consumer of coal in the world. The mining-induced surface subsidence has bad influences on the surface and structures above the surface. In order to minimize disaste

    Jan 1, 2017