Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)By A. Wahab Khair
This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance
Jan 1, 1992
-
Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United StatesBy M. Karmis
mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co
Jan 1, 1987
-
Applications Of Reflection Seismics To Mapping Coal Seam Structure And DiscontinuitiesBy T. L. Dobecki
As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic
Jan 1, 1981
-
Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal MinesBy Matthew J. DeMarco
Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t
Jan 1, 1993
-
Mining Under Strong RoofBy K. Y. Haramy
Strong roof helps minimize roof fall problems in coal mine entries. However, the Inability of strong roof to cave readily may contribute to major ground control problems In Iongwall and retreat mining
Jan 1, 1988
-
Pillarless Longwall Mining For Multiple SeamsBy Victor V. Nazimko
Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p
Jan 1, 1994
-
Three Dimensional Numerical Modelling Of Effects Of Subsidence On EscarpmentsBy Leigh J. Wardle
Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri
Jan 1, 1992
-
Mobile Roof Support For Retreat MiningBy H. Gene Wilson
Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and
Jan 1, 1990
-
Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months LaterBy Gift Makusha
Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u
Jan 1, 2004
-
Control Technology For Roof Drill OperatorsBy Bob Thomas
The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont
Jan 1, 1999
-
A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine RoofBy Syd Peng
In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l
Jan 1, 2005
-
Economic Impact of Ascending Mine?Waters in GermanyBy Axel Preusse
Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste
Jan 1, 2013
-
Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled StopeBy Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen
"As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.
Jan 1, 2018
-
Mine Design Considerations For Surface Subsidence ControlBy John L. Edwards
The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment
Jan 1, 1993
-
Rib Access Boom for a Roof BolterBy Joe McQuerrey, William Kendall, Gene Wilson
"Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.
Jan 1, 2010
-
Considerations for Effective Ground Support in EvaporitesBy C. A. Vining, J. R. Nopola
"Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can
Jan 1, 2018
-
Remote Mining Using Water for Ground SupportBy Robert L. Schmidt
The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result
Jan 1, 1986
-
Advanced Surveying Method For Measuring Roof ConvergenceBy M. Zaki Rashad
In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute
Jan 1, 1990
-
Mobile Roof Supports For Pillar Retreat MiningBy Robert P. Kudlawiec
The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th
Jan 1, 2000
-
Design Considerations For Bump-Prone Longwall MinesTailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a
Jan 1, 1999