The Initial Performance of Commonly Used Primary Support on U.S. Coal MinesBy Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
Surface Movement of Super-wide Longwall Panels Using Top-coal Caving MethodBy Cao Shenggen
Experiences in the developed countries have shown that continuous increase of panel width (or face length) is one of the major technical trends for high production high efficiency mines. Increasing th
Jan 1, 2003
-
The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in ChinaBy Jiacheng Wang
The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la
Jan 1, 2011
-
Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal MinesBy Murali Gadde
Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli
Jan 1, 2005
-
Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving MiningBy Wenbing Guo
Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and
Jan 1, 2011
-
Using Foaming Grout to Stabilize a Ventilation Raise in Very Poor RockBy John Magyar
Special foamed cements were used to stabilize and secure caving ground in a newly-reamed 12.5-ft diameter underground ventilation raise. Two zones of very poor Rock Mass Rating (RMR) material were enc
Jan 1, 2005
-
Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden StrataBy Shugang Li
The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this
Jan 1, 2005
-
Definition of Ultra-close Multiple-seams and its Ground Pressure BehaviorBy Baisheng Zhang
The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.
Jan 1, 2005
-
The Introduction of Uk Rockbolting Technology into Coal MinesAround the WorldBy Graham Daws
The introduction of UK rock bolting technology has been applied in many large underground coal mines around the world. This paper explains the methods that have been applied for its successful introdu
Jan 1, 2011
-
A Study on Geotechnical Risks in Interaction Between Open-Pit and Block CavingBy Ezzeddin Bakhtavar
There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f
Jan 1, 2011
-
Detecting Abandoned Coal Mine Entries by High Resolution Earth Resistivity MethodBy Xianxin Shi
In surface electrical exploration the high resolution earth resistivity method (HRRM) is a very effective method for detecting abandoned drift mines workings. When the abandoned mines are more than 50
Jan 1, 2005
-
Forecasting Roof Falls with Monitoring Technologies - A Look at the Moonee Colliery Experience (4e80a5f5-32b0-43df-a54a-da0b54b2c984)By Anthony Lannacchione
There has been a persistent need to forecast roof falls so that miner's exposure to hazardous underground environments can be minimized. Several monitoring techniques have been developed and are
Jan 1, 2005
-
Ground Control of a Mine Stope in Weak Rocks Subjected to High In-situ Stresses - A Case StudyBy Charlie Li
A cut-and-fill mine stope, located at a depth of about 1000 m in a lead-and-zinc mine, was closed down because of large roof convergence and fractures appearing on the hanging wall. The instability pr
Jan 1, 2005
-
BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and ApplicationBy Dan Payne
Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid
Jan 1, 2006
-
Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?By Russell Frith
Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities
Jan 1, 2005
-
Basics on the Dimensioning and the Extraction of Shaft Safety ZonesBy Anton Sroka
The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th
Jan 1, 2005
-
Analysis of Highwall Mining Stability - The Effect of Multiple Seams and Prior Auger Mining on DesignBy D. Newman
The objective of this is paper is to review the current state of knowledge and practice in highwall mining (HWM). HWM has become a standard method in surface mining, commonly used alone or in conjunct
Jan 1, 2005
-
Experimental and Numerical Methodology Assessment of Load Transfer Capacity of BoltsBy Naj Aziz
n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me
Jan 1, 2005
-
Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete SupportsBy E. Bauer
During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc
Jan 1, 1988
-
Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)By Daniel W. H. Su
This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan
Jan 1, 1987