Search Documents

  • SME
    Port of Miami Tunnel Study: Bored or Immersed Tubes?

    By Eldon L. Abbott, Rebecca K. Bolan

    The Florida Department of Transportation, Florida’s Turnpike Enterprise is studying the feasibility of a 1128 meter (3,700 foot) vehicular tunnel to provide direct access for Port of Miami traffic to/

    Jan 1, 2005

  • SME
    A Comparison Of Liberation Determinations By Particle Area Percentage And Exposed Particle Perimeter Percentage In A Flotation Concentrator

    To simplify programming, image analyzers commonly measure either linear intercepts or the areas of particles and grains to determine liberation based on polished section mounts. However, the concentr

    Jan 1, 2002

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2001

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building Damage

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami

    Jan 1, 2014

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Diamond Recovery Technologies

    By John Lindsay

    Outline ??Recovery plant requirements and concepts ??Common recovery plant unit processes ??Recovery plant design considerations ??Peripheral issues Process Design ??Liberation ??Separation ??

    Apr 1, 2005

  • AUSIMM
    A Deformed Gold-Arsenopyrite-Pyrite Deposit Hosted in Peralkaline Granite Porphyry at Sams Creek, West Nelson, New Zealand

    By K Faure

    At Sams Creek a gold-bearing, peralkaline granite pophyry dike intrudes Ordovician-Silurian metapelite and quartzite. These metasedimentary rocks have undergone three phases of folding: a first phase

    Jan 1, 2003

  • IOM3
    Engineering geomorphological mapping and opencast mining in unstable mountains - a case study

    By G. J. Hearn

    between particles in the classifying region is then

    Apr 1, 1995

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • AUSIMM
    Experimental Studies in the System PbS-FeS-ZnS-(Ag2S) at 1 Atmosphere to 27 Kilobars: Implications for the Broken Hill Orebody

    Experimental petrology may be used to accurately constrain PTX conditions in order to calibrate and understand geologic processes. This method may be used to answer postulated questions, by recreating

    Jan 1, 1998

  • AIME
    Minerals Beneficiation - Energy Size Correlation for Wet Rod Milling of Sylvinite

    By I. C. Edwards, G. E. Agar

    INTRODUCTION Many research efforts over the past years have been devoted to the study of energy consumption in comminution and the characteristics of the broken material. The old "laws" have been s

    Jan 1, 1967

  • NIOSH
    OFR-59-78 Test Of Inorganic Replacements For Resins

    By Fun-Den Wang

    Rock bolting has become a major method of coal mine roof support because of its effectiveness, economy, and convenience. The polymeric-resin-bonded bolt has generally proved to be more effective than

    Jan 1, 1976

  • IMPC
    Control of Grinding Conditions in the Flotation of Galena and Its Separation from Pyrite

    By John Ralston, Stephen Grano, Yongjun Peng, Daniel Fornasiero

    "A specially designed mill which allowed the control of pH throughout grinding was used to study the effect of rgrinding conditions on galena flotation and galena separation from pyrite. The various r

    Jan 1, 2003

  • SME
    Technology News - GE Supplies Electrical Systems for Bucyrus Draglines

    GE Industrial Systems has received a multimillion dollar contract from Bucyrus International to supply complete electrical systems for three new draglines. These machines will be installed at Coal Ind

    Jan 1, 2000

  • NIOSH
    IC 8799 Mine Power Systems Research (In Four Parts) 1. Trailing Cables

    This Bureau of Mines report is devoted to descriptions of investigations pertaining to underground mine trailing cables, their handling, splicing, and the use of couplers.

    Jan 1, 1979

  • SME
    The Construction of the Manhattan Water Tunnel, New York City ? Introduction

    By Edward (Ted) Dowey

    City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres

    Jan 1, 2008

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • IMPC
    The Immobilisation of Organic Waste by Geopolymerisation

    By Leon Lorenzen, Charlene Gokhale

    "In excess of 24 x 106 tons (Eskom, 1997) of coal-derived fly ash is produced annually in South Africa for the production of electric power. A large quantity of this ash is disposed of as a solid wast

    Jan 1, 2003

  • DFI
    An Analysis Of Interaction Between Laterally Loaded Structure And Soil

    By Zhu Tonghao

    A method of calculating anti-slide pile, sheet pile, underground diaphragm and structure with anchors etc. is proposeed in the paper. The effect of the various layers of soil, anchors and bracings etc

    Jan 1, 1991