A Non-Linear Programming Model for Open Pit Mine Equipment SelectionIn mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen
Dec 6, 2010
-
Kinetics Of Reduction Of Different Manganese OresBy Manoj Kumar, S. Ranganathan, S. N. Sinha
The reducibility of three different manganese ores with coke was studied. The three ores were reduced to different extents under the same experimental conditions. The investigations showed that in the
Jan 1, 2007
-
Evaluation On The Structure-Activity Relationship Of Copper Sulfide Collectors By DFT InvestigationThe molecular structures of isobutyl xanthate (IBX), diisobutyl dithiophosphate (DIBDTP), O-isobutyl-N-ethyl thionocarbamate (IBETC), O-isobutyl-N-ethylcarbonyl thionocarbamate (IBECTC) and O-isobutyl
Feb 27, 2013
-
Value Creation Through Strategic Mine Planning and Cutoff Grade OptimizationThe OptiPit® software program is developed based on expertise gained at the Colorado School of Mines (CSM) using Mixed Integer Linear Programming (MILP) techniques. This program has been developed to
Jan 1, 2007
-
In Situ Studies On Service Life And Pick Consumption Characteristics Of Shearer DrumsBy B. Tiryaki
Longwall shearers usually suffer from excessive pick and pickholder consumptions and severe wear of the back plate of the clearance ring section of shearer drums. In practice, most of the drums were s
Jan 1, 2004
-
Analysis of Powder Processing in the Roller Press Using Finite Element ModelingBy Richard K. Komarek, Antonios Zavaliangos, Roman T. Dec
"The work in the paper introduces a 2-dimensional finite element model for analyzing particular material processing in a roller press. Two basic roller geometries are considered: (a) smooth rolls (use
Jan 1, 2003
-
Ontario Hydra T.G.S. Chimney Demolition Thunder Bay, Ontario, CanadaBy Ray Jambakhsh, Gabrielle Bourget
In the summer of 1998, Ontario Hydro awarded a contract to demolish an obsolete and inefficient chimney by blasting. The Ontario Hydro Thunder Bay Thermal Generating Station (T.G.S.), is a fully opera
Jan 1, 2000
-
Electronic Detonator Performance Evaluation Barrick Goldstrike Mines Inc.By Doug Bartley, Roy McKinstry, John Floyd
In March of 2001, Barrick Goldstrike became the first surface gold operation in North America to evaluate the advantages of electronic detonators. A detailed study was conducted to quantify the benefi
Jan 1, 2003
-
A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi CrossingBy Chester M. F. Peters
The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first
Jan 1, 1997
-
Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble FormationBy Emad Farouz
The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c
Jan 1, 2006
-
Steel Cleanliness And Hydrogen In Liquid SteelBy R. Dekkers, J. Plessers
The feasibility of using hydrogen to obtain clean steels is investigated. High hydrogen contents are generally considered as detrimental due to the risk of flakes, bubbles and breakouts during casting
Jan 1, 2004
-
Biological Preoxidation Leaching for Refractory Gold and SilverBy R. W. Lawrence
"Biological leaching can be used to enhance the recovery of gold and silver from refractory ores, concentrates and tailings. The method liberates precious metals associated with sulphide minerals such
Jan 1, 1985
-
Classification-Based Probabilistic Design Of Ground SupportBy Radford B. Langston, John A. Marjerison, Graham C. Howell, Hendrik A. D. Kirsten
Probabilistic design is gaining wider acceptance in the rock engineering community since it allows more rigorous determination of risk relating to ground fall or excavation instability. Risk analysis
Jan 5, 2007
-
OFR-58(2)-83 Development Of Selective Submicrometer Particulate Fire Detectors For Underground Metal Mines - In-Mine EvaluationBy G. F. Skala
Additional testing of two prototype instruments for the discrete detection of submicrometer particles in metal and nonmetal underground mines is described. The detectors are designed to utilize prope
Jan 1, 1982
-
Coal - Minerals Beneficiation - Flotation of Corundum: An Electrochemical InterpretationBy H. J. Modi, D. W. Fuerstenau
pH effectively regulates the flotation of corundum through its control of the surface charge. Since collector ions function as counter ions in the double layer, the collector must be anionic when coru
Jan 1, 1961
-
The introduction of UK rock bolting technology into coal mines around the worldBy G. Daws, N. Woodward, A. Oxley
Many mines around the world have been seeking ways to achieve sustainable developments and reduce operating costs. Rockbolting is a technology that needs to be considered as it provides a means of red
Jan 1, 2011
-
Block/panel caving pressing final open pit limitBy S. Fuentes, J. Cáceres
"During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p
Jan 1, 2004
-
MLA 84-83 - Mineral Investigation Of The Coyote-Southeast Rare II Area (No. 5033), Inyo County, California ? SummaryBy Donald O. Capstick
A mineral resource evaluation of the Coyote-Southeast RARE II area (No. 5033) was performed jointly by the U.S. Bureau of Mines and the U.S. Geological Survey in 1981 for the U.S. Forest Service RARE
Jan 1, 1983
-
OFR-79-85 Strategic And Critical Materials Program Annual ReportBy R. E. Chaney
This report summarizes the research on the Strategic and Critical Materials Program tasks conducted at the Idaho National Engineering Laboratory (INEL) between Mdy 1983 and April 1984. The work is
Jan 1, 1984
-
Tap-Hole Maintenance and Management on Furnace 10 at Eramet Norway PorsgrunnBy J. E. Davidsen, M. Honstad
"A well-maintained tap-hole channel is important in order to achieve good and stable furnace operation over time. A worn or short tap-hole channel can lead to more violent flow, significantly increasi