Search Documents

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • AUSIMM
    Mineralisation and Alteration at El Pe±on Mine, Northern Chile

    The El Pe±on gold-silver deposit comprises four epithermal, low-sulfidation veins, which contain 2.9 million oz Au and 48 million oz Ag. Provisional data on alteration mineralogy, fluid inclusions, an

    Jan 1, 2002

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • SME
    Anticipated Behavior Of Silty Sands In Tunneling

    By Ronald E. Heuer, Debra L. Virgens

    INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,

    Jan 1, 1987

  • DFI
    Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in Clay

    By John S. McCartney, Ismaail Ghaaowd

    This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally

    Jan 1, 2018

  • SME
    Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling

    By K. Awuah-Offei

    Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The

    Jan 1, 2012

  • SME
    Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, Slovakia

    By Chikaosa Tanimoto

    INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Design Of Axially Loaded Compression Piles According To Eurocode 7

    By Bauduin C. Besix

    The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load

    Jan 1, 2002

  • SME
    IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the future

    By H. Hejny

    "The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only

    Jan 1, 2011

  • AUSIMM
    Financial Assurance for Mine Closure - A New Zealand Perspective

    A variety of environmental financial assurance instruments are in use across the globe. This paper reviews some of the more common forms currently used in New Zealand, Canada, USA and Australia. In or

    Jan 1, 2006

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • SAIMM
    Towards Predictive Control Of Ferroalloy Furnaces: Combining Thermochemistry, Inventory Modelling And Systems Engineering

    By S. J. Frank

    Ferroalloy furnaces are well known to be extremely difficult to control from a metallurgical perspective. Mostly metallurgical control is still reactive in nature, causing a significant amount of rewo

    Jan 1, 2004

  • SME
    Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? Introduction

    By D. Shin

    The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo

    Jan 1, 2012

  • CIM
    Sampling and Assaying of Coarse Gold at La Herradura – Minera Penmont S. de R.L. de C.V., Mexico (50ed6113-280f-4c5e-b31d-b2173f6016d8)

    By Pablo González, Rodolfo Espinosa, Jose-Luis Noyola, Sergio Cossio

    "Minera Penmont, at La Herradura, is a joint venture between Industrias Peñoles, S.A. de C.V., and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura

    Jan 1, 2003

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited

    CONTENTS: Broken Hill The mixing stations.Operating and mixing apparatus.Pulp distribution.Stope preparation.Filling procedure.Consolidation of old fill.Drainage:Pulp density tests. Life of sand pipe

    Jan 1, 1944

  • AUSIMM
    Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria

    GENERALTHE coal deposit, where it is being worked, consists of a bed of brown coal varying in thickness from 120 ft. to 200 ft., covered by an overburden of clay, drift, loam, etc., of a thickness of

    Jan 1, 1924

  • IIMP
    Utilización del Programa GoldSim para aplicaciones de planeamiento estratégico

    By Siegfried Arce

    Existen muchas herramientas para la gestión de proyectos. Sin embargo, éstos no están en capacidad de realizar análisis de riesgos y evaluar alternativas que consideren incertidumbre. En ese sentido,

    Aug 25, 2002