Search Documents

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • AUSIMM
    Treatment of Mixed Sulphides by the ôHorwoodö Process

    ALTHOUGH the development of the various flotation processes during the last 8 years has been so revolutionary, this development has been, until recently, entirely confined to the separation of the gan

    Jan 1, 1912

  • SME
    Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. Coalfields

    By P. Schilizzi, A. Jarosz, M. Karmis

    This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide

    Jan 1, 1986

  • SME
    Effects of Temperature and pH on Pressure Filtration of Coal Refuse Slurry

    By G. S. S. Raman, M. S. Klima

    Coal refuse slurries stored in tailings impoundments can potentially lead to environmental concerns such as effluent seepage, property devaluation, and in extreme cases, dam failures. Pressure filtrat

    Jun 17, 2019

  • SME
    Effects of Temperature and pH on Pressure Filtration of Coal Refuse Slurry Mining, Metallurgy and Exploration

    By G. S. S. Raman, M. S. Klima

    Coal refuse slurries stored in tailings impoundments can potentially lead to environmental concerns such as effluent seepage, property devaluation, and in extreme cases, dam failures. Pressure filtrat

  • SME
    Effects of Temperature and pH on Pressure Filtration of Coal Refuse Slurry Mining, Metallurgy and Exploration (08bb591f-8b35-4c27-9be5-b591d55e4b86)

    By G. S. S. Raman, M. S. Klima

    Coal refuse slurries stored in tailings impoundments can potentially lead to environmental concerns such as effluent seepage, property devaluation, and in extreme cases, dam failures. Pressure filtrat

  • TMS
    Thermodynamic Analysis On Synthesis Of Fibrous Ni-Co Alloy Powders Precursors With Co-Precipitation Process

    By Zhan Jing

    Keywords: thermodynamic, Ni-Co alloy powders, composition, fibrous The mathematics model of Ni(II)-Co(II)-C2O42?-NH3?H2O-H2O of thermodynamic equilibrium system has been developed theoretically acc

    Jan 1, 2005

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • CIM
    Investigating the Potential of Hydrofloattm Coarse Particle Flotation Techniques on Copper Sulphide Ores

    By P. J. Mehrfert

    "Recovery of mineralized coarse particles is notoriously low in conventional concentrators that treat copper porphyry ores. The application of coarse particle flotation techniques has the potential to

    Jan 1, 2017

  • AUSIMM
    China-In The Post-War World

    The reconstruction of the world after the present war must inevitably be profoundly influenced by the rise and progress of New China.The principle of Chinese mathrity has been admitted by Great Britai

    Jan 1, 1944

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • DFI
    Hydraulic Impact Pile Hammers ? Background

    By Patrick Bermingham

    The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes

    Jan 1, 1987

  • SME
    Educational Programs And Partnerships In Mineral Engineering

    By Wijnand Dalmijn, Hans de Ruiter

    Experience over the past eight years has proven that partnership and cooperation in mineral engineering education is essential to maintain programs in this field. At this moment the joint European Min

    Jan 1, 2005

  • SME
    Recovery Of Phosphate Values From Benefication Wastes

    By N. Abdel-Khalek, A. Youssef

    The tailings from beneficiation of Florida phosphate ore contain considerable phosphate values. These tailings are currently discharged into large disposal areas. More than three million tons of P2O5

    Jan 1, 2002

  • AUSIMM
    Possibilities and Working of the Specific Agglomeration of Fibrous Materials and Residues

    Possibilities and Working of the Specific Agglomeration of Fibrous Materials and Residues Plant based fibrous materials are becoming of increasing interest in a multitude of industrial applications.

    Sep 13, 2010

  • AIME
    Institute of Metals Division - Strain Measurement on Wires at High Temperature (TN)

    By T. Price, H. A. Holl, A. P. Greenough, A

    UdIN, Shaler, and ulff' first used wires for the determination of the surface energy of a solid metal. A gage length was marked by tying knots in the wires, which were then suspended in a cylinde

    Jan 1, 1964

  • CIM
    Development of Copper/Nickel Separation at INCO

    By P. Wells

    "In the past decade, there have been many developments in processing of nickel/copper sulfide ores. Improved pentlandite/pyrrhotite flotation selectivity with the use of new reagents, fine regrinding

    Jan 1, 2004

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • SME
    New Insitu Instrumentation Technique For Tunneling & Mining Design: Field Examples

    By Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida

    A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to

    Jan 1, 1976