Search Documents

  • DFI
    Diaphragm Walls Seismic Design According to the Eurocodes

    By J. Matos e Silva

    "Abstract Although one can think that it is very low the probability of a seism occurrence during the execution of an excavation in an urban lot protected by a diaphragm wall curtain, reality shows th

    Jan 1, 2014

  • SME
    Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38

    By J. S. Peterson, G. P. Cole

    The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll

    Feb 24, 1997

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • SAIMM
    Process Description And Abbreviated History Of Anglo Platinum?s Waterval Smelter

    By M. Jacobs

    Keywords: Smelting, converting, sulphide, sulphide smelting, platinum, platinum group metals, PGM, base metals, nickel, copper, matte, slag, furnace, electric furnace, Söderberg, electrode, granulatio

    Jan 1, 2006

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • SAIMM
    Metallurgical Benefit Of Reactive High Grade Ore In Manganese Alloys Manufacturing

    By L. Joncourt, N. Touchard, G. Pochart, C. Perdon

    Worldwide, the major Manganese ores can be separated into three different types: ?Oxidized ores (MnO2): in Australia, Gabon, Brazil,?. ?Semi-oxidized ores (Mn2O3): in South-Africa, Australia,?.

    Jan 1, 2007

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • AUSIMM
    Production of Cobalt Oxide, Cobalt Sulphate and Electrolytic Cobalt

    In, one stage of the purification sequence of the zinc sulphate electrolyte used at Risdon, cobalt is, precipitated as cobalt nitroso-,B-naphtholate, which is separated from the solution by filtration

    Jan 1, 1949

  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • SME
    "SAFETY FIRST" in the development of underground mining machines

    By E. Lammer

    "Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio

    Jan 1, 2011

  • DFI
    Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With Defects

    By Khamis Y. Haramy

    Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled

    Jan 1, 2007

  • NIOSH
    IC 6973 Annual Report Of The Mining Division For The Fiscal Year 1937 ? Introduction

    By Chas. F. Jackson

    The work of the Mining Division is divided among seven sections, each in charge of a supervising engineer, as follows: 1. Metal-mining methods section, the supervising engineer of which is also su

    Jan 1, 1937

  • TMS
    Mechanisms Of Oxygen Partial Lead Softening

    By Sadegh Firoozi

    Experiments measuring the kinetics of oxidation and making visual observations of the oxidation of approximately 6 g static lead baths containing arsenic, antimony and tin were conducted in the temper

    Jan 1, 2006

  • AUSIMM
    A New Method for Coal Pillar Design

    By KEITH BARRONI

    In the proposed criterion for coal a distinction is made between brittle and "psuedo-ductile" failure. This criterion is the basis for the development of new equations for coal pillar streng

    Jan 1, 1988

  • AUSIMM
    Presidential Address, 1979: The Mining Industry-the Key to Social Change

    Perhaps one of the most important conferences or symposia which our Institute has conducted, was the joint Aus. LM.M./AJ.M.E. meeting held in Canberra in May 1978, with the theme International Resourc

    Jan 1, 1979