Search Documents

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • AUSIMM
    Tectonic Severance of Links between Placer Gold and its Sources, Southern New Zealand

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Otago Schist belt of southern New Zealand hosts widespread orogenic gold deposits. Eros

    Mar 18, 2015

  • SAIMM
    Air Pollution Control System Upgrade At Tubatse Ferrochrome

    By Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday

    Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system

    Jan 1, 2007

  • AUSIMM
    Intrusive rocks associated with Gold Mineralisation in Southeastern Papua New Guinea

    By Clarke DS

    The igneous intrusions in SE Papua New Guinea are part of a sub-volcanic to plutonic, high-K calc-alkaline to shoshonitic suite. High-K andesitic to dacitic intrusives on Misima and Woodlark Isla

    Jan 1, 1991

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • CIM
    Effect of Biological Gas Generation on Oil Sand Fine Tailings

    By C. Guo

    The Mildred Lake Settling Basin (MLSB) is the largest disposal site for mature fine tailings (MFT) at the Syncrude Canada Ltd oil sands plant. Over the past years (since 1997), there has been a marked

    Apr 1, 2005

  • SAIMM
    Improving productivity at an open-pit mine through enhanced short-term mine planning

    By T. J. Otto, G. C. Lindeque

    Productivity is improved by increasing the ratio of output to input. In an operating open-pit mine, improving the productivity of heavy mining equipment (HME) enables the unit cost of production to be

    Nov 1, 2021

  • SME
    Miners Remain Upbeat at NWMA Meeting

    By Steve Kral

    As the current boom in the global mining industry rumbles on, mining companies have had to step up their efforts to replace mined reserves. Many of the majors are replacing and adding to their reserv

    Jan 1, 2006

  • NIOSH
    IC 9451 - Self-Contained Self-Rescuer Field Evaluation: Sixth-Phase Results

    By Nicholas Kyriazi, John P. Shubilla

    The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Laboratory, has undertaken a study to determine how well self-contained self-rescuers (SCSRs), deployed in accord

    Jan 1, 2000

  • NIOSH
    OFR-39(1)-82 Use Of Personal Equipment In Low Coal: A Review Of The Personal Equipment Literature

    By Mark S. Sanders

    This report is a review and synthesis of the published literature dealing with personal equipment items used by low seam coal miners. This report reviews the following items of equipment: headgear, ou

    Jan 1, 1978

  • AUSIMM
    The Use of Cost Indices to Update Historical Mine Costs

    The application of cost updating with the aid of cost indices is reviewed with particular regard to the mining industry. Examples of applicable cost index series are included with values given for t

    Jan 1, 1990

  • SME
    Developing And Implementing An Enterprise Reliability Strategy (ERS) In Mining Operations

    By J. W. Davis

    In the last few years major industrial companies have begun to realize the importance of Reliability as an enterprise strategy that, properly implemented, will improve financial performance. Typical

    Jan 1, 2003

  • AUSIMM
    Kinetics of the Gaseous Reduction of Hematite

    The widely accepted kinetic model for the gaseous reduction of hematite is critically examined. The formation of the wustite layer during internal reduction cannot be explained in terms of solid-state

    Jan 1, 1964

  • SAIMM
    Quest for ?effective pack? support - Synopsis

    By M. A. Kujoana

    Following on the design of good mining layouts and regional support systems, and the implementation of sound strata control practices, stope support is the ultimate strategy to combat the hazards of r

    Jan 1, 2009

  • SME
    Hydro-Jex© Operations At Anglogold Ashanti?s Cripple Creek & Victor Gold Mine

    By T. Seal

    Hydro-Jex© releaching was undertaken during the summer of 2010 at the Valley Leach Facility (VLF) at AngloGold Ashanti?s Cripple Creek & Victor Gold Mine. Several advancements to the technique were m

    Jan 1, 2011

  • SME
    Recent Developments In High-Pressure Water-Jet Assisted Cutting Of Rock And Coal

    By George K. Schenck

    INTRODUCTION Recent advances in high-pressure water jet technology can be effectively employed in mining and tunneling. The new equipment is based on available industrial hardware such as pumps, no

    Jan 1, 1983

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • AIME
    Coal - Daily Maintenance and Complete Overhaul of Continuous Miners

    By J. Mason

    In order that the use of continuous mining machines be most economic, the equipment must be operated at rated capacity as much of the time as possible and downtime for repairs kept at a minimum. A lar

    Jan 1, 1961

  • AUSIMM
    Kainantu Gold-copper System, Papua New Guinea

    By K Prendergast, P Dale, I Taylor, A J. Vigar, B Lueck

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kainantu Project is located within the New Guinea Thrust Belt in northern Papua New Gui

    Mar 18, 2015