Search Documents

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • TMS
    Leaching Studies for the Recovery of Metals from the Waste Printed Circuit Boards (PCBs)

    By Manis Kumar Jha

    Leaching studies were carried out for the recovery/ recycling of metals from PCBs containing 17.05% Cu, 0.74% Ni, 1.74% Fe, 4.35% Pb and 8.32% Sn using various acids such as H2SO4, HCl and HNO3. While

    Jan 1, 2010

  • SAIMM
    A New Underground Auger Mining System

    By I. L. Follington

    This paper describes the research and development programme to develop a prototype underground auger mining system aimed at developing and demonstrating an underground auger mining system able to prov

    Jan 1, 2001

  • CIM
    Application of expert systems for peak power management

    By Y. L. Su, S. Vongpaisal, H. A. Smith

    "It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F

    Jan 1, 1993

  • SME
    An experimental and numerical study of two-way splits and junctions in mine airways

    By R. K. Jade

    Although several studies in combining and bifurcating flows in two-way junctions and splits are reported, deviations persist in the estimated shock loss coefficients (SLCs). Due to their complex natur

    Jan 1, 2009

  • SAIMM
    Reduction Kinetics Of Manganese Oxide From HC FeMn Slags

    By M. Tangstad, D. Lu, G. Tranell, S. Gaal, J. Safarian

    The kinetics of MnO reduction from high carbon ferromanganese slag was investigated using a sessile drop technique at 1600 ºC. The effects of reductant type, ambient atmosphere and slag composition on

    Jan 1, 2007

  • SME-ICGCM
    Introduction of Long, High Capacity, Highly Tensioned, Post- Grouted Cable Bolts at BHP Billiton?s San Juan Mine,

    By James Pile

    Long, high capacity, highly tensioned, cable bolts (strand bolts), stiff enough to be installed with resin like a solid bolt, yet flexible enough to be used in any lengths, have been widely used in

    Jan 1, 2007

  • NIOSH
    Slam Risks

    Although the mining industry has achieved record-low fatalities and injuries for each of the last three years, there are still too many miners injured or killed in this nation ís mining operations.

    Jan 1, 2005

  • NIOSH
    IC 7613 Petroleum Refineries, Including Cracking Plants, In The United States January 1, 1951 ? Summary ? Crude-Oil Capacity

    By J. G. Kirby

    The total number of petroleum refineries in the United States continued to decline during 1950, and according to the Bureau of Mines annual refinery capacity survey there were 357 refineries January 1

    Jan 1, 1951

  • AUSIMM
    Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem Database

    By J R. Goff, R Carver, D S. Sheppard

    The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma

    Jan 1, 2006

  • SME
    Siemens Controllers Aid Processing at the Madero Project

    By Rolando Gonzalez

    Mexico’s role in the world economic community continues to grow. And it is important that the country makes use of its natural wealth, including its large underground deposits of minerals and metals.

    Jan 1, 2003

  • AUSIMM
    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Sep 13, 2010

  • NIOSH
    IC 8066 Instruction Handbook: Fundamentals Of Accident Prevention For Coal-Mine Supervisors ? Introduction

    By W. H. Tomlinson

    This publication presents the basic text for a 20-hour accident-prevention training course developed for supervisors by the Federal Bureau of Mines. During the past 2 years, the course has been used b

    Jan 1, 1962

  • AIME
    Institute of Metals Division - Effect of Solute Elements on the Tensile Deformation of Copper

    By R. S. French, W. R. Hibbard

    FOR tensile deformation, if the stress value is defined by the ratio of the load to the actual area, and the strain value by the natural logarithm of the ratio of the immediate length to the original

    Jan 1, 1951

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • AUSIMM
    The Role of Precrusher Stockpiling for Grade Control in Mining

    By J E. Everett, K Jupp, T J. Howard

    Precrusher stockpiles are designed principally as buffers to decouple the mining and processing operations. They are usually paddock dumped or dumped over a face to form fingers by dumping haul truckl

    Aug 12, 2013

  • SME
    Canadian coal industry : Developments in resource conservation and productivity improvement

    By R. K. Singhal, H. Sahay

    Introduction In terms of the world's recoverable coal reserves, Canada ranks 10th, providing 0.6% of the world's total. The US is first with 27.8% and the Soviet Union follows with 24.1%.

    Jan 9, 1986

  • SAIMM
    Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis

    By G. S. Maré

    Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas

    Jan 1, 2010

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994