Search Documents

  • TMS
    A Recovery Technology of Ag from Composite Ag-Cu Electronic Wastes

    By Jinhui Li

    Silver is a very important metal used in a wide range of applications. It is necessary to recovery of Ag from electronic wastes for increasing of Ag price and circumstance protection. For separating a

    Jan 1, 2009

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • AUSIMM
    International Marketing - The Challenges

    INTRODUCTION ò World coal production, Exporters and Importers òNew Zealand Exports, Markets and Products ò Types of Markets and Price Setting ò Bench Mark Prices and Exchange Rate ò Transport ò Intern

    Jan 1, 1996

  • AUSIMM
    Granitoids and their Associated Mineralisation from Western Stewart Island

    By R Peden

    Recent, detailed mapping, (Allibone, 1986; Peden, in prep.) of north west Stewart Island, has shown that the Rakeahua Granite (Watters et al, 1968), is comprised of a wide range of granitoid bodies ra

    Jan 1, 1987

  • TMS
    Embrittlement of Low Carbon Low Alloy Steel Occurring in the Austenite and y-Ferrite Regions

    By Xingjian Gao

    The mechanical properties of a low carbon low alloy steel in the austenite and _-ferrite regions have been examined by thermal-tensile tests using a Gleeble-1500D system at temperatures in the range 6

    Jan 1, 2010

  • NIOSH
    OFR-11-71 Designing And Planning Open Pit Mining Operations With Computer Simulation Solutions ? Summary

    By Y. L. Su

    Deterministic and stochastic simulation were combined to develop a computer model of an open pit mining system using bucket wheel excavators and related materials handling equipment. The model is clos

    Jan 1, 1971

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • ISEE
    Generating Site Specific Blast Designs with State-of-the-Art Blast Monitoring Instrumentation and PC Based Analytical Techniques

    The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and

    Jan 1, 1994

  • ISEE
    Computer Modelling of Cast Blasting

    By G K. Jorkenson

    Blast designs to cast a percentage of overlying waste rock off coal seams differ greatly from conventional blast designs for surface coal mines. Today, blasting engineers can benefit from computer si

    Jan 1, 1989

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)

    By J. R. Goode

    "The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S

    Jan 1, 2004

  • ISEE
    Twin Pendulum-New Method to Simulate the Generation of Toxic Fumes

    By Gunnar Persson

    The borehole pressure/time history of blasting practice is simulated in a twin pendulum apparatus, where the expanding shotfiring gases force two steel slab swingers apart. A pilot installation built

    Jan 1, 1996

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • SME-ICGCM
    The Estimation of Ground Control Risk By Real?Time Quantitative Visual Assessments

    By Alexander Garcia

    Roof and rib falls are the basic ground control hazards associated with underground roadways during development, stand up and, if applicable, retreat. Falls of ground can happen following the deterior

    Jan 1, 2012

  • NIOSH
    IC 8037 Magnetite And Ilmenite Resources, Iron Mountain Area, Albany County, Wyo. ? Introduction And Summary

    By V. T. Dow

    Although the titaniferous iron occurrences at Iron Mountain have been known since 1850, exploitation of the deposits has been discouraged by the metallurgical difficulties encountered in treating the

    Jan 1, 1961

  • NIOSH
    OFR-14-76 Data Flow Requirements For Remote Supervisory Control Of Continuous Mining Machines - I. Introduction - A. Summary - 1. Objective

    By Harvey L. Pastan

    The purpose of the investigation and analysis described in this report is to assess the data flow requirements that are required for remote supervisory control of a continuous mining system. Since the

    Jan 1, 1975

  • AUSIMM
    Geology and Structure on the Mahakipawa Gold Deposit, Marlborough: Preliminary Results

    The Mahakipawa gold deposit is located 21 km northwest of Blenheim. It became the site of a small hardrock gold rush in 1889 following nearby alluvial gold discoveries in 1888. The study investigates

    Jan 1, 1993

  • SAIMM
    Development Of A New Operator Visibility Assessment Technique For Mobile Equipment

    By I. Bhattacherya

    Over the last three decades, the mining industry has been moving towards underground mechanized mining methods and the number of load haul dump (LHD) vehicles utilized has increased. The growth of mec

    Jan 1, 2006

  • CIM
    Development of a Magnetically-Levitated Skip to Hoist Ore

    By Ryan W. Ulansky

    This paper presents the conceptual design of a magnetically-levitated skip for use in an underground mine. A skip is used to move rock from an underground mine to its surface processing facility. Conv

    May 1, 2002

  • SME
    Stability Analysis For Steep-Slope Mines Reclaimed Using The Forestry Reclamantion Approach

    The Forestry Reclamation Approach (FRA) specifies that the upper 1.22 m of material on the reclaimed surface should be left as uncompacted as possible to facilitate tree root growth. One of the main c

    Feb 27, 2013