The Initiation of Bulk Explosives by PrimersNumerical simulation by a finite element computer code has bee* used to identify key stages in the initiation of confined bulk explosive by cast primers. The simulations have been verified by compar
Jan 1, 1990
-
Ground Control Procedures in Western Australian Underground Mines - a Critical ReviewA review of ground control procedures in Western Australian underground mines is presented. Geotechnical input into initial mine design and methods of ground control is rare. As a result, the frequenc
Jan 1, 1992
-
On-Stream Analysis and Sensors for Mineral ProcessingBy Mathew P. J
The CSIRO Division of Mineral and Process Engineering in Melbourne has been developing on-stream analysis sensors based on neutron and gamma radiation for better control of quality and process opera
Jan 1, 1991
-
The Economic Feasibility of Recirculation in Underground MinesBy Gostylla W
The economic feasibility of controlled district cross-cut recirculation is examined in this paper with particular reference to the most important mine ventilation network parameters. An algorithm i
Jan 1, 1988
-
Coal - Paper No. 4 Rank And Type Variations In Coals From The Southern And South Western Coalfields, New South Wales, And Their Influence Upon CokingBy Wilson R. G
The Bulli and Wongawilli Seams, the two principal sources of coking coal for the Port KKembla steelworks of Australian Iron and Steel Pty. Ltd., vary in rank and in type over the Southern and -Sout
Jan 1, 1969
-
The Development of a Novel Eye Tracking Based Remote Camera Control for Mining TeleoperationThe use of teleoperation in mining is increasing due to requirements to improve safety and reduce the number of people required to work in remote and difficult environments. We recently completed a pr
May 1, 2010
-
All-Flotation at North Broken Hill LimitedIN this paper the author's intention is to convey a brief resume of the lead flotation treatment and lead flotation machines, which have replaced the May jigs and Wilfley tables at the plant of t
Jan 1, 1930
-
Precious Metals in the Rosebery North-End Orebody, Tasmania, AustraliaBy Large RR
Precious metals in the Rosebery north-end orebody occur predominantly in sphalerite- galena-pyrite ore and to a lesser extent in massive barite mineralisation. Gold may also occur in the upper part
Jan 1, 1987
-
Mining Operations at Que RiverThe Que River Mine is a small under-ground base and precious metals mine located in north-western Tasmania. Current production rate is 220,000 tonne/yr from reserves grading 0.37% copper, 7.1% lead, 1
Jan 1, 1985
-
The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken HillA Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r
Jan 1, 1988
-
Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting PracticesBy Will D
This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde
Jan 1, 1993
-
Steam Winding EnginesWINDING engines are one of the most important units in the equipment of a mine. Upon the winding machinery depends not only the output of the mine, but it supplies in most cases the only means by whic
Jan 1, 1911
-
Vacuum Lift Systems for the Transport of Broken Rock in ShaftsBy Jones IO
Although small units have been in use formany years, particularly in opal mining at shallow depths, there has been little effort in the past to explore the potential of the vacuum lift system in other
Jan 1, 1984
-
Estimation of Reserves and Resources in Shear Zone Hosted DepositsBy Yates M. G, Rowlands A. T
Most geostatistical techniques applied to the estimation of ore reserves assume relatively unifonn grade and thickness within an ore deposit environment. In shear-hosted mineralisation this rarely occ
Jan 1, 1991
-
Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic ProcessesBy Demin SS
Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the
Jan 1, 1990
-
Liner Optimisation to Improve Availability of the Ridgeway SAG MillBy P Griffin
Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur
Jan 1, 2007
-
The Leaching of Synthetic Chalcocite and Covellite in Oxygenated Acidic Sulphate-Chloride SolutionsBy Lawson F
Narrowly sized samples of synthetic chalcocite (Cu2S) and covellite (CuS) were leached in oxygenated acidic sulphate-chloride solutions. Chalcocite leaches via a two-stage process, the first stage
Jan 1, 1989
-
Computer Simulation of In-Situ Leaching Relevant to the Broken Hill DistrictA simulation of the fluid flow, minera- logical and chemical aspects of in situ leaching is being developed for application to the recovery of metals from unbroken, naturally jointed rock. The flui
Jan 1, 1984
-
Ore Reserves Estimation Procedures Use On High Grade, Complex Nickel Sulphide Ores At Kambalda, Western AustraliaThe orebodies at Kambalda are complexly faulted, folded and intruded. It is realized that the ore reserve calculations will be wrong and steps are taken to minimise the errors. The calculations are
Jan 1, 1979
-
Retreatment/Flotation Rationalisation at RenisonRevised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap
Jan 1, 1991