Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Production Drill Optimisation at Telfer Underground - A Move Towards Automation

    By P F. Knights, P Boniwell

    This paper investigates the causes of low effective utilisation of the production drill fleet at the Telfer Underground Gold Mine, as measured by the percussion hours per shift. The first part of this

    Jan 1, 2008

  • AUSIMM
    Investigation of Weathering Properties of Tailings Sand From Boliden's Aitik Copper Mine, Sweden ù A Summary of Twelve Years of Investigations

    By N Eriksson

    BolidenÆs Aitik mine, located 100 km north of the Arctic Circle in northern Sweden, is one of EuropeÆs largest copper mines. This operation produces 18 Mt of ore per year and 99 per cent of this tonna

    Jan 1, 2003

  • AUSIMM
    The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical Simulation

    By Q Yu, G Ren, Z-Y Chen, J Yang

    The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole

    Aug 24, 2015

  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    Application of Atomic Absorption Specthophotometry

    In Mount Isa voltage and frequency fluctuations caused. by haulage shaft operation gave considerable difficulties with the initial application of Atomic Absorption Spectro-photometry.The methods used

    Jan 1, 1963

  • AUSIMM
    Broken Hill Metallurgy - A Story of Innovations in Processes, Equipment and Instruments

    By AJ LYNCH

    Broken Hill metallurgists have been responsible for some of the most important developments in mineral processing technology. These occurred mainly in two periods, 1902 - 15 and 1955 - 70. Mineral

    Jan 1, 1992

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    Resource Evaluation of Nuggety Slate-Hosted Gold-Quartz Reefs

    By A E. Annels, G F. Johansen, B W. Cuffley

    Nuggety gold-quartz reefs are characterised by localised, high-grades and in many cases coarse free-gold. Geometrical and grade complexities are often observed. The high-grade regions are generally er

    Jan 1, 2000

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Oceanographic Preparations for Offshore Operations

    By Nilsson C

    Man has always been and will always be part of his environment, in ,a good, bad or indifferent manner. Until quite recently, this environment has been the atmospheric boundary layer above the land m

    Jan 1, 1970

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability

    By H S. Welideniya, K Ekanayake

    Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with

    Mar 26, 2012

  • AUSIMM
    Orebodies in the Mt. Charlotte-Hannan's North Area, Kalgoorlie

    Orebodies in the Mt. Charlotte-Hannan's North area N. and E. of the town of Kalgoorlie provide a marked contrast to the pyritetelluride lodes of the Golden Mile, although both groups of orebodies

    Jan 1, 1965

  • AUSIMM
    The Role of the Mining Geologist - A Codelco Vision

    The main asset of a mining company is the mineral resource; without resources there is no mining business and the infrastructure is useless. In this context the role of the mining geologist is to alwa

    Jan 1, 2006

  • AUSIMM
    An Exploratory Study Of Pre-Nucleated Pelletisation

    By Adamiak Z. P, Nicol S. K

    An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared

    Jan 1, 1974

  • AUSIMM
    Industrial Ecology and Metal Production

    As the worldÆs population and global standard of living increase, the role of metals in the economy will not diminish in the 21st century, despite substitution and dematerialisation trends. Industrial

    Jan 1, 2000

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • AUSIMM
    The Central Eyre Iron Project – Process Selection and Design

    By D Connelly

    The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing

    Jul 11, 2011