Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fiber optic distributed sensing system for monitoring of tailings storage facilities

    By R Blin, R Walde, R Belli, D Inaudi

    A fiber optic distributed sensing system allows the monitoring of parameters useful to determine the short- and long-term behaviour of the structure in response to the external actions, including, eg

    Jul 1, 2021

  • AUSIMM
    Coeur d'Alene Mines - A Commitment to Growth

    Coeur d'Alene Mines is a precious metals producer which is dedi- cated to growth through it's exploration and acquisitions efforts. We foster and support these activities by providing our s

    Jan 1, 1991

  • AUSIMM
    Laboratory Corrosion Tests of Frictional Rock Bolts

    By D W. Airey

    Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup

    Nov 5, 2014

  • AUSIMM
    2001 is Here Now - Teleoperation and Automation of UG Vehicle

    Teleoperation is one method by which an operator can remotely control and monitor a vehicle. The operator monitors the status and progress of the remote vehicle by watching the video transmitted from

    Jan 1, 1998

  • AUSIMM
    Excess pore water pressure induced during tailings run-out

    By M A. Llano-Serna, D J. Williams, L Bu

    Tailings dam failures continue to occur worldwide at an unacceptable rate, averaging two events annually over the last 100 years. Furthermore, tailings dams continue to grow in size, increasing the po

    Jul 23, 2018

  • AUSIMM
    Air-core imaging in a hydrocyclone using non-invasive ERT Technique – effect of reconstruction algorithms

    By N Mangadoddy, P Jampana, S Diddi

    The study of air-core dynamics in hydrocyclone operation is essential for predicting separation efficiency in mineral processing. Electrical resistance tomography (ERT) allows non-invasive measurement

    Aug 24, 2022

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    Application of Lateral Crater Test in Open Pit Blasting Parameters Optimisation

    By Y M. Wang, W Z. Liu, L F. Li, X L. Zhang

    Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min

    Aug 24, 2015

  • AUSIMM
    Distributed Collaborative Immersive Virtual Reality Framework for Future Mine Scenarios

    By T Bednarz

    The present work proposes a distributed collaborative immersive virtual reality framework for prospective applications in the mining industry. A human-centered approach is described, with people being

    Nov 22, 2011

  • AUSIMM
    Flotation Separation of Scheelite from Calcite Using Alkylated 8-Hydroxyquinolines as Modifier

    By Recepoglu O, Tolun R, Yavasoglu N, Bulutcu AN

    Scheelite was floated from a low-grade (0.28 per cent W03) calcitic (96.30 per cent CaCO3) scheelite ore using oleoyl sarcosine as collector and alkylated 8-hydroxyquinoline as modifier. Compared to

    Jan 1, 1993

  • AUSIMM
    Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter Building

    By E Nik, A Manzoori, H Namavari, P Witt

    The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing

    Jan 1, 2004

  • AUSIMM
    Extension Hill Direct Ship Iron Ore Project – Seven Years in the Making

    By R Forster

    Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio

    Jul 11, 2011

  • AUSIMM
    Perspectives on Future Global Collaboration for Mining Research and Education

    By M Scoble

    This paper addresses the importance of collaborative approaches to resolving future mining challenges. It attempts to provide some insight into understanding the theory, measurement, mapping and manag

    Nov 22, 2011

  • AUSIMM
    Hot water management at PT Nusa Halmahera Minerals’ Toguraci Mine

    By J Isles, S King, A Valenza, R Lawolo, J Evert

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by a subsidiary of Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates

    Oct 16, 2017

  • AUSIMM
    Characterisation of In Situ Gold Particle Size and Distribution for Sampling Protocol Optimisation

    By I M. Platten, Y Xie

    Sampling protocols that are designed to suit the mineralisation style will result in a reduction of the nugget effect and hence resource risk. The a priori need for all sampling programs is the effect

    Jan 1, 2008

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Surface and groundwater monitoring and seepage control at the Sungun Copper Mine

    By N Pirouznia, F Rashidi Nejad, S Naraghi

    Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw

    Jul 23, 2018

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Augusta Gold-Antimony Mine

    By S Marshall, A Fowler

    The Augusta underground mine at Costerfield in Central Victoria has been in operation since mid 2006; however, AGD Operations Pty Ltd have explored and undertaken open pit operations in the area for o

    Jan 1, 2008