Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Tectonics, Geology and Gold-copper Metallogeny of New Guinea

    By S L. Garwin

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Since the Eocene, New Guinea tectonics have been driven largely by the south-westerly-direc

    Mar 18, 2015

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • AUSIMM
    Soil Washing and Bioremediation of Slime Dam Material from a Gold And Uranium Mine

    The solvent extraction section of an old Uranium Plant in the Vaal River region (North West Province in South Africa) produced a substance called CRUD (Chalk River Unidentified Deposit) that formed wi

    Jun 1, 2010

  • AUSIMM
    The Beginnings of Mineral Processing Research in Canada - A Short Account

    The Beginnings of Mineral Processing Research in Canada - A Short Account

    Sep 13, 2010

  • AUSIMM
    Addressing the challenges associated with the modelling of iron ore in vibrating screens

    By S Reid, W Chen, T J. Donohue, A Katterfeld

    The use of discrete element modelling (DEM) is widespread in the materials handling field, and is used for many applications. One of the important limitations in using DEM is the number of particles t

    Jul 24, 2017

  • AUSIMM
    Aggregates: Between a Rock and a Hard Place

    It is easy to demonstrate the importance of aggregates in any conversation about infrastructure and other engineering artefacts. Peoples around the world have made use of stone to enrich and enhance t

    Jan 1, 2000

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957

  • AUSIMM
    A geometallurgical perspective on a high-grade iron ore deposit at Kiirunavaara, northern Sweden

    By K Niiranen

    Luossavaara-Kiirunavaara AB (LKAB) operates one iron ore mine, three concentration plants and three pelletising plants in Kiruna, Sweden. The current methods of separation at the beneficiation plants

    Jul 24, 2017

  • AUSIMM
    The Crushing and Conveying Operation at the Martha Mine

    In November 1999 Waihi Gold Mining Company commissioned its new crushing and conveying plant used to transport both ore and waste from the Martha Mine to its ore processing plant and also its tailings

    Jan 1, 2001

  • AUSIMM
    Speciation of Arsenic in an Anaerobic Treatment System at a Pb-Zn Smelter Site, Gold Roaster Products, Cu Smelter Stack Dust and Impacted Soil

    Mining and metallurgical processing of gold and base metal ores often results in solid wastes and effluents containing high concentrations of arsenic. In addition, arsenic can be released to the atmos

    Jan 1, 2008

  • AUSIMM
    The Effect of an Excessive Addition of Copper Sulphate on the Flotation of Sphalerite

    By Dunkin H. H

    Flotation tests in a laboratory flotation cell at pH 8-8.5 and other sui}plementary tests were carried out on sphalerite-quartz and sphalerite-pyrite-'quartz mixtures. Depression of sphalerite re

    Jan 1, 1954

  • AUSIMM
    Optimal Block Estimation by Kriging

    A comparison is made between elementary block estimation techniques and the optimal methods of geostatistics using data from an Australian deposit. Considerable improvement in the estimates are obtain

    Jan 1, 1975

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936

  • AUSIMM
    Dipmeter Interpretation of Intra-Latrobe Group Fluvial Sand Bodies, Basker/manta Block, Gippsland Basin

    By Rayner B

    Five wells have been drilled in the Basker/Manta Block of VIC/P19, Gippsland Basin, resulting in sub-economic Intra-Latrobe Group oil and gas discoveries at Basker-1 and Manta-1. A total of 21 indiv

    Jan 1, 1992

  • AUSIMM
    Recovery of Fine Gold Particles from Philippine Gold Deposits by Enhanced Gravity Concentration and Flotation

    Recovery of Fine Gold Particles from Philippine Gold Deposits by Enhanced Gravity Concentration and Flotation The objective of the study is to determine the applicability of enhanced gravity concentr

    Sep 13, 2010

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • AUSIMM
    Filter-Pressing

    THE filter-press, which has done so much for the successful treatment of the sulpho-telluride ores of Kalgoorlie, has a serious rival in the vacuum process, and this paper is written with a view to ar

    Jan 1, 1910

  • AUSIMM
    Increased Rolling Mill Capacity at Kwinana and Newcastle

    The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa

    Jan 1, 1957

  • AUSIMM
    Foliation Thickness and Mica Grain Size: Two New Ways to Subdivide the Otago Schist, Zew Zealand

    At a regional scale, the Otago Schist has been divided into textural zones, metamorphic zones, structural transposition zones, and terranes and lithologic associations. Each of these subdivisions reve

    Jan 1, 2001

  • AUSIMM
    Interpretation of Flotation Data for the Design of Process Plants

    By G S. Lane, G D. Richmond, J Dioses

    This paper discusses the methods used in the design of flotation plants, including benchscale batch and locked cycle tests and pilot plant trials. Two case studies are presented, one for the Cadia Hil

    Jan 1, 2002