Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Exploration Rock Geochemistry in The Hauraki Goldfield, New Zealand (84b6bbd9-3523-4b3b-97b9-61989cb0b12f)

    By Nowell SB, Cottrill DA

    Host-rock - wallrock major and trace element geochemistry associated with epithermal gold mineralisation in the Hauraki Goldfield of New Zealand is poorly documented, even though rock geochemistry is

    Jan 1, 1990

  • AUSIMM
    A Practical Example of a Risk-Based Approach to the Design of an Open Pit

    By P R. G Milne

    A risk-based approach to optimising pit wall slope angles was trialled in the design of a 60m deep open pit in extremely weathered and distinctly weathered materials in the Kalgoorlie area. The pit us

    Jan 1, 2003

  • AUSIMM
    Modelling Demand for Water in the Mineral Extraction and Processing Industry - How Useful is the Theory?

    By A Keddie

    Standard microeconomic theory suggests that the behaviour of mineral extraction and processing firms with respect to their demand for water can be modelled and a market demand for water subsequently d

    Jan 1, 2006

  • AUSIMM
    Addressing the Root Causes of Deviations in Reconciliation and Value Tracking

    By W van der Westhuizen

    Mining professionals recognise the need and application for reconciliation and value tracking. It is necessary however to examine our current reality, and evaluate the following. Do our reconciliation

    Jan 1, 2002

  • AUSIMM
    Grade Control Sampling and Ore Blocking: Optimisation Based on Conditional Simulation

    By Khosrowshahi S

    The objectives of grade control remain unchanged but new methods are being developed to attain them. Since the early-1990s, an improvement in the power of mine site computers has made the geostatist

    Jan 1, 1997

  • AUSIMM
    Simulating the Interaction of Heavy Mineral Sands Mining With the North Stradbroke Island Groundwater System (Mining in Water)

    By I D. Hair

    A numerical groundwater model was used to predict the nature of interactions between heavy mineral sands mining operations and the groundwater regime at North Stradbroke Island, Southeast Queensland.

    Jan 1, 2003

  • AUSIMM
    The Oroya Shoot and its Relationship to Other Flatly Plunging Ore Pipes at Kalgoorlie

    Acclaimed as one of the most remarkable orebodies anywhere on account of its length and richness, the Oroya Shoot occurs on the eastern side of the Kalgoorlie gold mining district close to the contact

    Jan 1, 1959

  • AUSIMM
    The e-Mine

    By K Gilliland

    The past decade has seen the widespread implementation of computerised real-time operational management systems in open pit mines. While these systems have made a significant impact on operational eff

    Jan 1, 2000

  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    A Method to Separate Phases of Sulfur in Mine-Waste Piles and Natural Alteration Zones, and to Use Sulfur Isotopic Compositions to Investigate Release of Metals and Acidity to the Environment

    By C J. Berry, P H. Briggs

    Assessment of metal mobility, acid rock drainage production, and toxic effects from weathering of mineralised materials (ie mine-waste piles and outcropping alteration/ore zones) is key in evaluating

    Jan 1, 2003

  • AUSIMM
    The Use of Blast Monitoring/Modelling Technology for the Optimisation of Development Blasting

    By J C. Diaz, C R. Scherpenisse

    Blasting represents one of the most relevant unit operations in the process of mineral extraction. The final objective of this operation is that of obtaining an adequate final fragment size distributi

    Jan 1, 1999

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    Grindability of Indonesian Coals

    By Yu AB, Azahari HL

    Indonesia has the largest coal reserves in the south-east Asian region. According to estimates from the World Energy Confer- ence, it has reserves of 18 billion mt lignite, 4.4 billion mt sub-bitumi

    Jan 1, 1993

  • AUSIMM
    Gold, Research and Development, and Exploration Success

    The link between exploration success and new ideas from research and development (R&D), although often assumed, is rarely well explained or well illustrated. One issue is understanding the role of inn

    Jan 1, 2007

  • AUSIMM
    A Systematic Approach to Water Quality Management in the Minerals Processing Industry

    Mining companies often view water quality as an environmental issue. The importance of water quality as a production related issue in mineral beneficiation is greatly underestimated at many mineral pr

    Jan 1, 2006

  • AUSIMM
    Short description of the method of discharging and sampling ore received

    By T

    THE Sulphide Corporation's works for the smelting of ores containing lead, gold, and silver are situated close to the Cockle Creek railway station, on the main Northern railway line, and are abou

    Jan 1, 1918

  • AUSIMM
    Progress in Tropical Nickel Phytomining

    By P N. Nkrumah, A van der Ent, G Echevarria, P D. Erskine

    Nickel phytomining is a low cost alternative to traditional nickel mining and a complementary process to existing mining operations in areas with low-grade nickel soils or nickel waste material. The p

    Jun 28, 2016

  • AUSIMM
    Effects of the green transition on miners’ work, competencies and skills

    By J Johansson, E Lund, J Lööw, A Pekkari

    Technological development is accelerating in the mining industry (Abrahamsson and Johansson, 2021) and in large parts of the world there is an increased environmental awareness (United Nations, 2015).

    Sep 1, 2024

  • AUSIMM
    Long-term Monitoring and Targeted Assessments to Improve Management of Mine Wastes – the Batu Hijau Project

    By S L. Simpson, J Waworuntu, B M. Angel

    "The Batu Hijau copper/gold mine, operated by PT Newmont Nusa Tenggara, is located in the south-western part of Sumbawa Island, Indonesia, and is situated ~10 km from the south coast at an altitude of

    Jun 28, 2016

  • AUSIMM
    Data augmentation for image-based rock fragment recognition using StyleGAN

    By Y Tang, G Si

    The analysis of rock fragment sizes plays a pivotal role in various stages of geotechnical and mining engineering. Traditional case-based methods often falter in addressing the variability in rock fra

    Sep 1, 2024