Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • CIM
    Hydrogen Cracking and Fracture of Galvanized Transmission Tower Bolts

    By J. C. Thornley

    Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si

    Jan 1, 1979

  • CIM
    Vision for a Risk Adverse Integrated Geometallurgy Framework

    By Guillermo Turner-Saad

    "Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati

    Jan 1, 2010

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • CIM
    The Kemess Mines Ltd. Tailings Dam Construction Using Tailings Construction Sand

    By John Hoffert, Darren Colwell, Greg Tucker, Jeremy Kinch, Greg Rasmussen

    "The Kemess Mine, a major producer of gold and copper, is located in north-central British Columbia. Kemess was brought into production in May 1998 by Royal Oak Mines. On February 11, 2000 Northgate E

    Jan 1, 2004

  • CIM
    New bearing application for pinion gear drives on mine hoists

    By R. A. McIvor, R. Levac

    "The Stobie No. 7 shaft, 14 ft diameter, double- drum skip hoist, was installed at the INCO Limited Frood Stobie Complex in 1942. Figure 1 shows the hoist layout. The hoist was originally equipped wit

    Jan 1, 2001

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Making Foreign Workers Part of your Workforce

    By Paul Girodo

    Government Approval For Foreign Workers 1.Service Canada Work Permit Tasks: i. Prove there are no Canadian Journeymen; ii. Use heavyweight stakeholders; iii. Understand the FWU transformation tak

    May 1, 2006

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • CIM
    Using Gas Monitoring and Personnel/Vehicle Tracking to Maximize the Benefits of Ventilation-On-Demand in Underground Mining Operations

    By Tanveer Jahir

    With increasing energy costs and mounting government pressure to adopt low emission, green sources of energy, it has become imperative to develop long-term sustainable underground infrastructures that

    May 1, 2011

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing Facilities

    By Monique Pharand, Jeet Basi, Simon Hille

    "High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M

    Jan 1, 2016

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • CIM
    Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte Piping

    By S. C. Richardson

    The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a

    Jan 1, 2019

  • CIM
    Reduction in Dolomite Contamination in Pine Point Zinc Concentrate

    By D. A. Cormode

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 55 miles east of Hay River, N.W.T. by the southern shore of Great Slave Lake.The milling operation commenced in the fa

    Jan 1, 1977