    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    A Review of ISL Mining at the Highland Uranium Project

    By Laurence McGonagle

    "The Highland Uranium Project (HUP) is located approximately sixty miles northeast of Casper, Wyoming and is owned and operated by Power Resources, Inc. (PRI). With an annual production of680 tonnes (

    Jan 1, 1998

  • CIM
    What are the Opportunities and Challenges for Women in Fly-in-fly-out (FIFO) Mining in Canada? An Exploratory Study

    By Costa

    The fly-in-fly-out (FIFO) mining model has significant implications for the industry as it plays an important role in fulfilling the economic, social and workforce needs of the contemporary mining ind

    May 1, 2006

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • CIM
    Paste Backfill at the Brunswick Mine

    By Michael Cooper, Eric Konigsmann, A. Moerman

    "A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate

    Jan 1, 1999

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003

  • CIM
    Multilayer diffusion bonding of polycrystalline Al2O3 to Al-Sr and Al-Mg alloys

    By K. Janghorban

    Multilayered ceramic-metal composites were produced by solid state diffusion bonding of polycrystalline alumina and three Al alloys containing 1 to 2%Sr, 2% Mg and Mg + Si (5057 Al alloy), The multila

    Jan 1, 2005

  • CIM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultrafine Sulphide Concentrate

    By G. Deschênes

    The Eleonore property (James Bay district of Northern Québec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Jan 1, 2013

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    Effects of Borehole Deviation on Blasting Results and the Tolerable Error in Borehole Surveying

    By Jerry J. Ran

    In open stope mining borehole deviation is one of the main factors affecting the blasting results. Though previous research has identified some actual deviation patterns, these studies are unable to r

    May 1, 2002

  • CIM
    Population Statistics of Gold Nanoparticle Morphologies Determined by HREM Observations

    By Kenji Koga

    In order to derive the population distribution of gold nanoparticle morphologies as a function of size, highresolution electron microscopic (HREM) observations and structural analyses were done for ov

    Oct 1, 2003

  • CIM
    Development of the Athabaska Oil Sands

    By Max W. Ball

    THE world's largest known oil deposit lies in northern Alberta. In fact, according to government estimates, the famous so-called 'tar sands' of the Athabaska region contain several time

    Jan 1, 1941

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001

  • CIM
    Vanadium-bearing magnetite and ilmenite mineralization and beneficiation from the Sinarsuk V- Ti project, West Greenland

    By T. Grammatikopoulos, A. McKen, O. Christiansen

    Vanadium mineralization occurs in oxide-rich horizons within layered metagabbro zones of the Sinarsuk deposit, West Greenland. The main oxide minerals are vanadiferous magnetite and ilmenite, comprisi

    Jan 1, 2002

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994