Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ore Thawer at Pine PointBy R. J. Johnston
"INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division
Jan 1, 1972
-
Algom Nordic. -Development to ProductionBy M. W. Airth
ON THE 6TH JULY in the year 1953 an announcement was made to the public that touched off one of the greatest staking rushes in the history of mining in Canada and resulted, in tl1e space of a few shor
Jan 1, 1958
-
Progress in Dust Control at Ontario MinesBy Clifford S. Gibson
A year ago a paper (1) was presented at the Annual Western Meeting of the Institute regarding silicosis in Ontario mines. It described the whole problem as we see it and discussed the means of prevent
Jan 1, 1939
-
Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test ResultsBy Linda C. M. Elliot, Liangxue Liu
"The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On
Jan 1, 1997
-
When does a project with Questionable Viability, Warrant Further Investment?By David Whittle
When does a project with questionable viability, warrant further investment? There are cases in which projects, which evaluate to a negative mean probable value, are worth investing in. There are al
May 1, 2006
-
Scraper Loading and Scraper ConveyingBy J. B. Keast
Introduction The last two or three decades have been marked by striking developments in methods of mining and tunnelling. In view .of increased competition and various economic factors, intensive &ap
Jan 1, 1933
-
Tailings Disposal at Kidd Creek Mines Ltd.By T. J. Yeomans
"The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi
Jan 1, 1986
-
Characterization of Reference Gold CatalystsBy Susumu Tsubota
Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by
Oct 1, 2003
-
The Kwyjibo Polymetallic Iron Oxide Deposit, Northeastern Grenville Province, QuebecBy Francis Chartrand
The Kwyjibo deposit is an iron oxide Cu-REE-F-Mo-Au mineralization of Mesoproterozoic age located in the Grenville Province approximately 120 km NE of Sept-Îles, Quebec (Figure 1). Occurring along the
May 1, 2003
-
The Automatic Burning of CoalBy A. Ignatieff
"Demonstrations of Automatic Coal Burning EquipmentAT THE 1951 and 1952 Annual Coal Research Conferences sponsored by the Dominion Coal Board and attended by delegates from the Dominion and Provincial
Jan 1, 1953
-
The Colomac ProjectBy V. N. Bryant
"1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec
Jan 1, 1990
-
The Order in the Disorder: Quantitative Analysis of an XRF Sorter PerformanceBy A. Mazhary, T. Huff
Sensor-based ore sorting technology is a growing area of interest due to lower-grade ore deposits and higher costs of processing, among other reasons. Among the sensors currently utilized in the parti
Jan 1, 2019
-
Supercharge Your Ore Testing and Characterisation with the JKRBTBy Peter Rubie, Toni Kojovic, Fengnian Shi
"Mining companies have recognized that characterization of ore breakage plays an essential role in the design and optimization of comminution circuits.Recently the Julius Kruttschnitt Mineral Research
Jan 1, 2009
-
Operation of Enviro Clear Thickeners in Series as CCD UnitsBy L. W. Hamel
"Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and
Jan 1, 1979
-
Continuous SAG Volumetric Charge MeasurementBy Andre Vien, Jean-François Dupont
"Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p
Jan 1, 2001
-
Operation and Improvements at the El Indio Roasting FacilityBy John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson
"The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot
Jan 1, 1999
-
Improved Cleaner Circuit Performance at the Degrussa Copper Mine with an In Situ Column Sparging SystemBy E. Wasmund
"Sandfire’s DeGrussa Copper-Gold operation in West Australia is a new high grade copper sulfide mine, which includes a 1.5 Mtpa concentrator which was completed in 2013.Early after commissioning, it w
Jan 1, 2016
-
Computer Control of Flotation at Mattagami Lake MinesBy D. W. Hendriks, C. Daoust, K. V. Konigsmann
"The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o
Jan 1, 1976
-
Use of the Attainable Region Method to Optimise a Milling and Leaching ProcessBy G. Danha, D. Glasser, D. Hildebrandt, N. Hlabangana
"In this work, we apply a method known as the attainable region (AR) technique in order to optimize the milling and leaching process of a low grade gold ore. No work on the application of the AR optim
Jan 1, 2016
-
Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami MillBy Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin
"The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr
Jan 1, 2001