Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
Confined Space And Inner-City Projects – Future Challenge And Opportunity For Diaphragm WallingBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. One can anticipate that globa
Nov 1, 2022
-
Session 10 Deep Mixing Method IBy Peter Cali
There is one organization in Sweden, The Swedish Deep Stabilization Research Centre, which has been working with these questions and there is also a project, Eurosoilstab, within European Union to tak
Feb 10, 2003
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
The Stiffening Effect of a Caliche Layer on Pile FoundationsBy Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian
"Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la
Jan 1, 2015
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Helical Piers with Grouted Shafts -A Case HistoryBy Jr. D'Angelo, Michael M. Blendy, Shawn Downey
"A grouted helical pile was used to support new buildings in the reconstruction of a large residential development. Foundation options were complicated by urban fill underlain with variable alluvial s
Jan 1, 2005
-
Marine Foundation Retrofi t for the Richmond - San Rafael BridgeBy Patrick E. Durnal, Henrik Dahl
"A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the
Jan 1, 2007
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled ShaftsBy Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
Session 23 "Grout in Rock and Mining"By John Davie
We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is
Feb 10, 2003
-
Effect Of Curing Stresses On The Mechanical Properties Of Soil-cement Mixed MaterialsBy George Onorato, Giovanni Bonita
Deep soil mixing (DSM) has now become a ubiquitous ground improvement technique across the globe for producing soil-cementous materials for many types of complex civil and environmental applications.
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station ConstructionBy Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Drilled Shaft In Strong Rock-Design, Validation, And Construction Of The Beauharnois Canal Bridge, Autoroute 30 MontréalBy Ivan Hee
The 2.5km long bridge over the Beauharnois Canal and St. Lawrence Seaway is a major structure in the new Autoroute 30 project near Montreal. Foundations for the bridge consist of footings on bedrock,
Jan 1, 2011
-
Influence of EPS Geofoam on the Soft Foundation Improved By Deep Mixed ColumnsBy Walid El Kamash, Sadik Oztoprak
"Soft soil presents a challenge against multistory buildings in some cities of Egypt such as Port Said due to the consolidation settlement. Deep mixed (DM) columns are used to improve the soft foundat
Jan 1, 2015
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling TechniquesBy Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017