A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Development of New Shaft Resistance Models for Piles Driven in the Puget Sound LowlandsBy Armin W. Stuedlein, Youssef Bougataya
Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci
Jan 1, 2018
-
Complex Piling Works At London Blackfriars StationBy Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted PilesBy John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? SynopsisBy Y. G. Qin
In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i
Jan 1, 2010
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? IntroductionBy Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In DrivingBy Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Installation, Design, And Quality Control Of Augercast Piles ? IntroductionBy William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall ConstructionBy Robert Bachus, Jamey B. Rosen
"Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe
Jan 1, 2014
-
A Proposal Of Calculation Of Piled Raft FoundationsBy Andrzej Tejchman
Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M
Jan 1, 2002
-
Design Of Augered Cast In Place (ACIP) Piles - IntroductionBy Michael McVay
The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven
Jan 1, 1997
-
Ground Movements - A Hidden Source Of Loading On Deep Foundations (211df4c9-c07d-4182-8335-8f47bcc59b12)By Harry G. Poulos
Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism
Jan 1, 2007
-
Interface Testing For The Design Of Micropiles In Expansive SoilsBy Robert W. Schaut
The use of micropiles is increasing for new construction and to retrofit distressed foundations in expansive soils. Typical micropiles in expansive soils have a lower section where the micropile grou
Jan 1, 2011
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction ExamplesBy J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989