Inspector's Manual For Driven Pile Foundations ? IntroductionThis manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an
Jan 1, 1997
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Impact And Ramifications Of Setup For Pile FoundationsBy Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Laboratory Study on Creep Behavior of Chemically Stabilised Soft Soils under Unconfined ConditionsBy Venda Oliveira P. J., Correia A. A. S., Danisi C. M.
"AbstractA laboratory study has been undertaken to establish common understanding of the creep phenomenon of a Portuguese soft soil chemically stabilised with binders. In order to study the effect of
Jan 1, 2014
-
Pressure Injected Footings Mobile Convention Centre - IntroductionBy D. G. Bishop
This paper is intended as a review and update of the use of Pressure Injected Footings as deep foundation units in North America. We will discuss various aspects of this pile and then discuss a partic
Jan 1, 1992
-
Selection & Design Of Augered Cast-In-Place (ACIP) PilesBy Dan A. Brown
Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa
Jan 1, 2004
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Apportioning Risks On An Urban Deep Foundation ProjectBy Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? SynopsisBy J. M. Pei
In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se
Jan 1, 2010
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Underpinning A Crane FoundationBy Donald R. McMahon
This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man
Jan 1, 2006
-
Piled Raft Design For High Rise Buildings In East London, UKBy D. P. Nicholson
The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South
Jan 1, 2002
-
Evaluation of Engineering Properties of Expansive Soils Mixed with Waste EPS BeadsBy B. Soundara, A. Suganya, S. Selvakumar
"Expansive soils have a potential for shrinkage or swelling under changing moisture content. Attempts were made to reduce the swelling potential of expansive soils with conventional additives such as
Jan 1, 2017
-
Diaphragm Walls Acting As Anchor Curtains Of Laterally Loaded Structures - SynopsisBy J. Matos e Silva
The paper refers two examples of structures located in seismic areas (Cases 1 and 2). The first one (Case 1) is the Torroal Bridge, located about 100 Km South of Lisbon, in the road Troia-Grandola
Jan 1, 1996
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, LondonBy J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989