Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
Design And Performance Evaluation Of Bored Piles In SandBy Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
Load Test Analysis On Augered Pressure Grouted Displacement PilesBy Wei Zheng
A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under
Jan 1, 2007
-
Non-Linear Analysis Of Laterally Loaded Piles: Calibration Of A New MethodBy Vasileios A. Drosos
The response of pile foundations to lateral loads is an important factor for the successful performance of several critical structures. A new numerical code for the analysis of single piles under late
Jan 1, 2006
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment DescriptionBy Jean J. Abiassi
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t
Jan 1, 1994
-
Real Time Monitoring the Historic Old South Church, Boston, MassachusettsBy Pierre Gouvin, Michael Oakland
"This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple
Jan 1, 2017
-
Little Britain Project: Construction Of BasementBy R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
-
Predication Of Heave For Deep Excavation With Irregular Plane ShapeBy Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
Ultimate Pullout Capacity Of Batter PilesBy M. R. Madhav
The ultimate pullout capacity of single batter piles has been presented in literature in three contradictory trends. These trends are: the pullout capacity of a single batter pile increases, remain al
Jan 1, 2010
-
Performance Of A Large Diameter Drilled PierBy A. J. Partos
One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan
Jan 1, 1989
-
Construction Of Long Tubular Column Foundations Under Deep Water ? SynopsisBy C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded ShaftsBy Cheng Lin
The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a
Jan 1, 2009
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil TypesBy Lee R. Buhagiar
As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile
Nov 1, 2022
-
Harmonization and Status of Geotechnical Standards in EuropeBy Trevor L. L. Orr
"AbstractThe background to the harmonization of geotechnical standards that has taken place in recent years in Europe has been the move to more economic and political integration following World War I
Jan 1, 2014
-
St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown MicropilesBy J. L. Goen
The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large
Jan 1, 2004
-
Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid PilesBy Timothy C. Siegel
A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design
Jan 1, 2011
-
Jet Grouting As Soil Improvement In Southeast FloridaBy Evelio N. Horta
The influence of soil improvement replacement area in foundation settlements is discussed for soil improvement methods used in Southeast Florida. A 3D Finite element analysis is used for two typical c
Jan 1, 2007
-
Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral LoadingBy Padmavathi V. Sagi
In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin
Jan 1, 2006