    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017

  • DFI
    Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing

    By Donald R. Clark

    Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

  • DFI
    Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite Bedrock

    By Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay

    "Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven

    Jan 1, 1900

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead Wall

    By WenJun Dong

    This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st

    Sep 8, 2021

  • DFI
    Kosciuszko Bridge Main Pylon Deep Foundation Solution

    By A. Daugiala, D. Coleman

    In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E

    Jan 1, 2016

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

    By Vijayakumar Viramuthu, Martin Heinrich

    Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T

    May 1, 2022

  • DFI
    Analysis of Water Leakage in Downstream Dam Toe of Komani Dam

    By Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi

    "Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita

    Jan 1, 2016

  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Atoka Pipeline - Canadian River Crossing

    By Jewels Stover, Charles A. Luxford

    Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv

    Sep 8, 2021

  • DFI
    Staged Construction of an Interstate I69 Embankment: Coupled Hydromechanical Numerical Simulation

    By Malek Smadi, Yazen A. Khasawneh

    "New embankments were constructed mostly on soft clays as part of interstate I69 extension in southern Indiana. The embankments serve as bridge abutments and as part of the fill sections along the int

    Jan 1, 2017

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Designing Piles for Seismic Events

    By H G. Poulos

    "This paper sets out a simplified approach by which the practical foundation designer can undertake the relevant calculations to satisfy the requirements for deep foundation design in seismic areas. T

    Jan 1, 1900

  • DFI
    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel

    By Amit Srivastava, Monica Malhotra

    In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through

    Sep 1, 2022

  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006