Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Tied-Back Micropile Walls In Landslide RepairBy Kevin W. Cargill
In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound
Jan 1, 2006
-
"Value Engineering" In United States Of AmericaBy Maral Papazian Bedian
Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng
Jan 1, 2002
-
Recent Evolutions In Deep Foundation TechnologiesBy Maurice Bottiau
It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses
Jan 1, 2006
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
A Tale of Two Dams: Performance of Deep Cutoff WallsBy Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders
"This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv
Jan 1, 2017
-
Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
-
Assessing the Bearing Capacity of Existing Wood Pile FoundationsBy Almer E. C. van der Stoel
"Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e
Jan 1, 2014
-
Wanapum Dam Repaired Using Post-Tensioning AnchorsBy Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein
In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o
Jan 1, 2018
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction GroutingBy Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - SynopsisBy N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Conventional And Box-Shaped Piled RaftsBy Heinz Brandl
Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The
Jan 1, 2002
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
Marine Foundations - Title ? Table Of ContentsJan 1, 2005
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?By Paul Doherty
Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress
Jan 1, 2009