Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Behavior of a Piled Raft in Dry Cohesionless Soil Subjected to Lateral LoadingBy Srijit Bandyopadhyay, Aniruddha Sengupta, G. R. Reddy, Raj Banerjee
The objective of the present endeavor is to compare the performance of a pile raft system in foundation sand subjected to lateral loads. To study the behavior of pile raft system in sand a laboratory
Jan 1, 2015
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Capacity of Hydraulically Jacked PilesBy Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger SuperstoreBy George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2005
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
San Francisco International Airport Air Traffic Control Tower Pile FoundationsBy Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz
"The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to
Jan 1, 2017
-
Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - ContentsBy Frank Rausche
Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples
Jan 1, 2001
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope StabilizationBy Nasr Sheta
"After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability
Jan 1, 1900
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Drilled Shaft Design, Testing and Construction in New Jersey Turnpike - Case StudiesBy Abu B. Siddique, Anthony S. Crincoli
"The New Jersey Turnpike Section 2 widening program consisted of widening between Interchange 6 in Mansfield Township, Burlington County and Interchange 9 in East Brunswick Township, Middlesex County.
Jan 1, 2015
-
Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis BayBy Kevin Kuhl
With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid
May 11, 2007
-
Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case StudyBy Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli
"The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the
Jan 1, 2016
-
Predicting Geotechnical Drilled Shaft Capacity: Are We Close?By James G. Ulinski, Sebastian Lobo-Guerrero, Vishal B. Patel
"Recently modified design equations used in the transportation industry to calculate side friction and end bearing capacity for drilled shafts are now providing more realistic estimations of capacitie
Jan 1, 2017