Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast Control for the Hydroelectric Project "El Cajón" in the State of Nayarit in Mexico

    By David Yanez

    The hydroelectric project "El Cajón" is currently under construction in the state of Nayarit, on the Santiago River, in western Mexico. This project is comprised of a Concrete Face Rockfill Dam (CFRD)

    Jan 1, 2006

  • ISEE
    Investigative Studies on the Explosives Characteristics of Loxite Explosives

    By Kamal Wadhwa

    Liquid oxygen explosives have been used in India for well over 5 decades now. These are being extensively used both for shallow and deep hole blasting in the various opencast mines and quarries for mi

    Jan 1, 1991

  • ISEE
    Recruiting, Retaining, and Integrating Future Talent For the Explosives Industry

    By Joshua Hoffman

    The recruitment and retention of future talent into the explosives industry is becoming increasingly important. Student chapters help with this effort but what are they doing and are there things they

    Jan 1, 2013

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

    By David Harrison, Brian Harrison

    The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comp

    Jan 1, 2018

  • ISEE
    Journal: 100 Years / A PRIMER ON EXPLOSIVES FOR COAL MINERS Bulletin 17 by Charles E. Munroe & Clarence Hall U.S. Bureau of Mines, Washington, D.C.

    By Robert Hopler

    Of the common causes of the larger mine accidents, such as falls of roof and coal, gas and dust explosions, mine fires, and the misuse of explosives, all of which are often closely related, each must

    Jan 1, 2012

  • ISEE
    Electronic Blast Initiation Sequencing – Designing for Productivity

    By Greg Wyartt

    "At an Australian iron ore open-cut mine, 129 separate blast patterns (consisting of 38.5 million tonnes /42.4 million US tons, equaling 28% of annual blasted tonnes) were initiated using electronic d

    Jan 1, 2017

  • ISEE
    Explosives Camp – Insanity or Cold Calculation?

    By Paul Worsey, Barbara Robertson

    In June 2007, Missouri Science & Technology (formally UMR) successfully held its 5th and 6th Explosives Summer Camps. The camps, which include substantial industry participation, have been an outstand

    Jan 1, 2008

  • ISEE
    Busting Myths at the Energetic Materials Research and Testing Center

    By G. Walsh, L. Wolkovitch, A. Savage, V. Romero, T. Zimmerly, G. Imahara, J. Hyneman, K. Byron, D Tapster, S. Belleci, J. Metzger, M. Stanley

    Testing was conducted at the Energetic Materials Research and Testing Center for the MythBusters on three separate occasions. This testing included (1) an experiment designed to create diamond from gr

    Jan 1, 2010

  • ISEE
    A Technique for Measuring Toxic Gases Produced by Blasting Agents

    By Richard J. Mainiero

    Traditional techniques for the experimental determination of toxic fumes produced by the detonation of high explosives are not applicable to blasting agents. To detonate properly, blasting agents requ

    Jan 1, 1997

  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    Multiple Seed Waveform Vibration Model of blasts Established at Mont-Wright Mine

    By Joe Atalla, Leojenen Etulle, Jesse Desrochers, Joseph Mukendi Kabuya, Remi Proulx, Ruilin Yang

    The Mont-Wright mine is Canada's largest open-pit iron ore mine with multiple open pits in operation. It is operated by ArcelorMittal Mining Canada in the northeast of the province of Quebec, near the

    Jan 26, 2026

  • ISEE
    Presplit Assessment by Signature Hole Blast Vibration with Accelerometer Measurement

    By Remi Proulx, Ruilin Yang

    The effectiveness of presplit in soft or fractured ground is hard to visualize or quantify. There have been many attempts by the blasting community to measure and quantify the effectiveness of prespli

    Jan 1, 2019

  • ISEE
    Using Machine Learning and Novel Algorithms to Predict Muckpile Shape and Throw to Engineer a Perfect Blast

    By Ravi Sahu, Brad Gyngell, Oktai Radzhabov

    Design machine learning approach to simulate the process of muckpile throw distribution before blasting.

    Feb 1, 2020

  • ISEE
    Application of Underground Pre-Splitting in Butte, MT

    By M. Gebhardt, J. Johnson, S. Rosenthal

    The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education

    Jan 1, 2024

  • ISEE
    Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine

    By Chris Searing

    An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th

    Feb 6, 2023

  • ISEE
    Blasting soft, plastic mineral inside a silo at a copper mine

    By Benjamin Cebrian

    Metallurgical testing at Cobre Las Cruces prior to production at the mill was done with overburden gossan. Some of that test gossan was a very fine material, wet by the water conditions at the bottom

    Jan 1, 2010

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    Drill and Blast Trial Planning During Drill-Mill Optimization Project

    By Tristan Worsey, John Henchion, Nathan Rouse, Yannick Lauras

    "This paper presents an approach used to plan and evaluate drill and blast trials for a mine that currently mechanically excavates in-situ rock. The document presents the approach used to plan the tri

    Jan 1, 2017

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    Underwater Plug Blast at Manic-C Hydro-Electric Project

    By P Albert

    A wedge-shaped underwater rock plug has to be blasted in order to tap the reservoir and furnish water to a new underground powerhouse at Manicouagan-5. The paper deals with the design and engineering

    Jan 1, 1984