Remotely Piloted Aircrafts (RPAs) as an Everyday Tool for Quarry Planning and Blast Design.By Jose Luis Pineda Villarreal
New technologies emerge every day with practical applications for open pit mining. For every operation, managers need to understand the best way to increase efficiency in drilling, blasting, fragmenta
Jan 1, 2018
-
Effect of Explosive Charge Geometry on Shock Wave PropagationBy Martin Langenderfer, Catherine Johnson, Phillip Mulligan, Kelly Williams
The physical geometry of a charge has a direct correlation to the geometry of the shock wave. This relationship appears strongest within the boundaries of the visible fireball. As the shock wave propa
Jan 1, 2018
-
New Methodology for Excavation of High Drawbells With Pre-Loading.By Guillermo Lazcano Ríos, Jorge Parvez Aguirre, Alejandro G. Díaz Berríos, Felipe Rodriguez Alveal
Codelco's Chuquicamata Underground Division (DCHS) faces issues due to collapses in its subsidence streets, which hinders the advancement of the subsidence front and leads to the loss of areas and res
Jan 21, 2025
-
Engineering Control and Information Management of Blasting Programs in Construction and Quarrying OperationsBy Frank Sames, Brad Terhune
In many construction projects and in most quarrying operations drilling and blasting remains the only feasible method of loosening rock in the removal of rock or overburden, the development of the qua
Jan 1, 2004
-
Iron Ore Blast Designs and Cap Testing at the Minntac MineBy Jack Eloranta
To improve control of blasting, tests were performed to assess non-electric cap accuracy. Simultaneous testing using a Velocity of Detonation Recorder (VODR), Red Lake Lo-Cam and an Instantel DS-677 b
Jan 1, 1992
-
Tunnel Construction Efficiency and Vibration Control using Electronic Detonators: Focusing on the Contour Holes and Decking ModeBy Sami Kara, Yunseok Park, Seung-Joong Lee, Namsun Hwang, Michael Laing
This study conducts a comparative analysis of construction efficiency. In the first part we compared electronic and non-electric initiation systems, focusing on tunnel contour holes. Field blasting op
Jan 21, 2025
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis A. Davidsavor, David A. Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
Feb 1, 2020
-
Electronic Detonator and Initiation Systems - Implications of the Dominant Design for Widespread Acceptance and Sales of this 'New' TechnologyBy Steve Brace
Electronic detonators have been commercially available to the mining industry worldwide for over ten years. It is estimated that total cumulative global sales will have reached 25 million units by the
Jan 1, 2004
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis Davidsavor, David Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
-
Close-in Pipeline Trench Blasting – Why PipeBlast Does Not WorkBy N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins
PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi
Jan 1, 2024
-
Back to School on Construction Blasting, Rules of Thumb RevisitedBy Jerry Wallace
Construction of a new grammar school required blasting within three meters of the existing school. Due to changes not anticipated at time of bid opening, blasting had to take place while approximately
Jan 1, 2001
-
A New Method for the Prediction of Blast Vibrations and Suggestions with Respect to Uniform Reference Values for Short-Time VibrationsBy Robert Boehnke, Bernd Mueller
This contribution presents an innovative, statistically supported method to predict blast vibrations in rock mass. For modelling the processes during and after detonation, a theory is employed which i
Jan 1, 2004
-
The Effects of Blasting on Crushing and Grinding Efficiency and Energy ConsumptionBy Lyall Workman, Jack Eloranta
Blasting has an important impact on mining and milling well beyond the necessary ability to dig and load the ore efficiently. There is an increasing body of blasting research indicating significant im
Jan 1, 2003
-
Effects of Accurate MS Delays on Productivity, Energy Consumption at the Primary Crusher, Oversize, and Ground Vibrations and AirblastBy James W. Reil, Douglas A. Anderson, Steven L. Burchell
A total of 26 full-scale production blasts at three sites were extensively monitored with sophisticated instrumentation systems to determine the benefits of more accurate detonators. The new and more
Jan 1, 1986
-
Charge Geometry Effects on Pressure Waveforms in a Shock TubeBy Joshua Hoffman, Braden Lusk, Kyle Perry
Shock tubes are used to simulate large-scale arena explosions without the use of full-scale arena sites that utilize large quantities of explosives. Instead, small explosive charges can be used to dri
Jan 1, 2010
-
Federal Blaster Certificate ProgramBy Kenneth Eltschlager
Blasting represents the highest risk of any surface coal mining activity that could result in injury and/or property damage off the permit area. In addition, blasting related issues e.g. flyrock, vibr
Jan 1, 2010
-
Coyote Blasting - An OverviewBy S. S. Jenkins Jr.
While the method is seldom used anymore, coyote blasting is an historically interesting way to blast large quantities of rock. It was used extensively in the days before modern fast drills were availa
Jan 1, 2005
-
Journal: 21st Annual Photo Contest - Honorable Mention, "Demolition Blasting 1,000 Milliseconds in the Demolition of a Cyclone Tower"By Walter Voglauer, Elisabeth Zechmeister
Five serial photos show the first second of the demolition of a 75 m high, reinforced concrete tower in the 23rd District of Vienna, Austria. The tower demolition with high explosives was necessary be
Jan 1, 2015
-
Projectile Generator Design for Underground Coal Mine Seal TestingBy Ethan Steward, Kyle Perry
Underground coal mines have several dangers, one the most hazardous of which is the possibility of an explosion caused by the ignition of methane gas. To reduce ventilation costs, coal mines have the
-
A Quantitative Triple Bottom Line Mine to Mill Process EvaluatorBy X. Gumede
A model is being developed to quantify the benefits for mining houses resulting from the reduction in greenhouse gas and energy consumption by the application of innovative blast designs in addition t
Jan 1, 2012