    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    Blast Vibration and Overpressure Control Using Sequential Blasting Techniques at Inco's McCreedy West Mine

    By Ray Jambakhsh, John Okell, Frank Cook

    "In early 1988, an experimental study was carried out at the Inco's McCreedy West Mine inLevack, Ontario. The objective was to develop blasting techniques which would allow themine to maintain product

    Jan 1, 1993

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984

  • ISEE
    Utilising a Dual Belly Auger MPU to Manufacture Bulked Inhibited Explosives

    By Jason Rock, Rob Thompson, Lee Julian

    This paper presents an innovative shift in inhibited bulk products with specific reference to their manufacture and application.

    Feb 1, 2020

  • ISEE
    Mitigating Loaded Blast Patterns Buried Beneath a High Wall Failure

    By Aiden Carey, Jim Kennedy

    During December 2007, Lake Cowal Gold Mine located in New South Wales, Australia experienced a significant pit wall failure. The wall failure resulted in the deposition of a large quantity of saprolit

    Jan 1, 2011

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • ISEE
    The 8 Millisecond Rule is Dead – Or Is It?

    By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley

    The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t

    Jan 21, 2025

  • ISEE
    Utilization of Aerial Drones to Optimize Blast and Stockpile Fragmentation

    By Ran Tamir

    "This document introduces the use of drone generated aerial photography to collect and analyze fragmentation data for both muck piles and post crusher stockpiles in order to support the continuousimpr

    Jan 1, 2017

  • ISEE
    Explosive Induced Damage Potential to Earthfill Dams and Embankments

    By D O. Doehring, W A. Charlie, W A. Lewis

    The detonation of explosive charges releases large quantities of energy that can produce rock and soil deformations far from the detonation point Extensive data are available on blasting in general an

    Jan 1, 1987

  • ISEE
    Explosives Cost Reduction and Fragmentation Improvement at Inco's McCreedy West Mine

    By Steven Townend, Don Wadden

    In today's global economy the need to stay competitive is essential for commercial survival and growth. To this end Inco is committed to continuous improvement in its operations. Various aspects of th

    Jan 1, 1994

  • ISEE
    Open Face Design Optimization

    By Owen Collins

    In surface mining, designing patterns to reduce the probability of flyrock and optimizing fragmentation through powder factor calculations are important for safe, efficient blasts. The designed powder

    Jan 26, 2026

  • ISEE
    Manufacturing and Aging Effects on Pentolite Boosters

    By Jeffrey W. Lin, Jonathan D. Abbott, Patrick R. Bowden, Tyson J. Plitt

    Pentolite is a class of high explosives containing trinitrotoluene (TNT) and pentaerythritol tetranitrate (PETN) with PETN content typically ranging from 40 to 60 wt%. Manufacture involves melting TNT

    Jan 21, 2025

  • ISEE
    " A Good Neighbors Policy"; the Evolution of O & G Industries, Inc.'s Public Relations Policy Working With the Local Towns

    By Douglas R. Simms

    O & G Industries, Inc. owns and operates a number of rock quarries within the State of Connecticut. These rock quarries are surrounded by residences and commercial neighbors who have concerns related

    Jan 1, 1994

  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Ore guiding in underground mining using MWD and machine learning

    By J. Sanchidrián, A. Fernández, P. Segarra

    The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi

    Jan 1, 2024

  • ISEE
    The Importance of Keeping Accurate Records Time Trails

    By Brad Bockey

    Whether you are a driver, blaster, or are in charge of filing, you must recognize the importance associated with DOT-required recordkeeping. As various agencies become intertwined with rules governing

    Jan 1, 2011

  • ISEE
    Controlled Shaft Sinking Using Electronic Delay Detonators and Water Ballast

    By Greg Rappard, Francois Holowenczak, James Rickard

    The King George V (KGV) Shaft forms part of MTR Corporation Limited (MTRCL) Works Contract 703 extension of the underground West Island Line on Hong Kong Island. The Shaft and the associated adit was

    Jan 1, 2013