Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    A Pipeliner's Perspective on Longwall Mining

    By Robert B. Francini

    Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.

    Jan 1, 2011

  • SME-ICGCM
    Field Verification of the Roof Fall Risk Index: A Method to Assess Strata Conditions

    By Anthony T. Iannacchione

    The Roof Fall Risk Index (RFRI) is a new method introduced by the National Institute for Occupational Safety and Health (NIOSH) to assist the underground stone mine operator in 1) assessing defects t

    Jan 1, 2006

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?

    By Dan Payne

    The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo

    Jan 1, 2008

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Material Instability Hazards In Mine Processing Operations

    By John W. Fredland

    Many accidents occur in the mining industry as a result of the instability of material during handling and processing operations. Accidents due to dump point instability at stockpiles, and at spoil or

    Jan 1, 1993

  • SME-ICGCM
    In-Situ Tests and Numerical Simulation about the Effect of Annulus Thickness on the Resin Mixture for Fully Grouted Resin Bolt

    By Andre Zingano

    The objective of this paper is to study the effect of annulus thickness on the quality of resin mixture for fully grouted resin bolt. Pullout and mixture tests were made in underground coal mines for

    Jan 1, 2008

  • SME-ICGCM
    New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)

    By Roland C. Walker

    Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging

    Jan 1, 2009

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • SME-ICGCM
    The Development and Application of Polyurethane Injectable Cable Bolts

    By Dakota D. Faulkner

    Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United

    Jan 1, 2012

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Coal Bumps in an Eastern Kentucky Coal Mine 1989 to 1997

    By John Hoelle

    Coal mines in southern West Virginia, south-western Virginia and eastern Kentucky have experienced coal bumps at least since 1933. Most of the bumps have occurred due to high cover, strong roof and f

    Jan 1, 2008

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996