Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Decade of Mobile Roof Support Application in the United States

    By Larry Howe

    Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei

    Jan 1, 1998

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    Prediction Of Subsurface Subsidence For Longwall Mining Operations

    By Yi Luo

    Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs

    Jan 1, 2000

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Weatherability Test of Rocks for Underground Mines

    By Kot F. Unrug

    The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit

    Jan 1, 1997

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    A Method for the Selection of Rock Support Based on Bolt Loading Measurements

    By Stephen P. Signer

    A method to assist in the evaluation and selection of roof bolts using in situ measurements of roof bolt loading has been developed by researchers of the Spokane Research Center, National Institute of

    Jan 1, 1997

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    Highwall Augering In Ultra-Thick Western Coal Reserves: Unique Geotechnical And Operational Challenges

    By Timothy Ross

    The Pittsburg & Midway Coal Mining Co.'s Kemmerer Mine is one of the deepest surface coal operations in the world, with the highwall extending to approximately 1,000 ft above the pit floor. To in

    Jan 1, 1999

  • SME-ICGCM
    Support of Tunnels in South African Gold Mines

    By L. Z. Wojno

    Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee

    Jan 1, 1987

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Ground Control Design For Multiple Seam Mining Using Finite Element Analysis

    By John Stankus

    Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre

    Jan 1, 1999