Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    Effects of Panel Mining Sequence and Retreat Direction on the Roof Stability of Longwall Headgate Entries

    By Jinsheng Chen

    The major functions of longwall headgate entries are to provide access ways to the outby submains or mains for coal transportation and to the longwall face for fresh air and for transporting men and m

    Jan 1, 1998

  • SME-ICGCM
    Strata Control Advances At Jim Walter Resources, Mining Division

    By Eddie Martin

    Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea

    Jan 1, 1988

  • SME-ICGCM
    Hazard Mapping Combining Geostatistical Modeling Of Coal Mine Roof Quality Ratings With Numerical Modeling Of Stress Data

    By J. Riefenberg

    U.S. Bureau of Mines (USBM) researchers are developing a personal computer-based hazard mapping system for use in underground coal mines. Hazard mapping is rapidly gaining interest as delineating area

    Jan 1, 1994

  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    Structure, Strength And Relaxation Of Interbuden For Input Into Highwall Mining Design In The Baralaba Coal Measures Of Queensland, Australia

    By Bret E. Leisemann

    The geomechanical environment in which highwall mining must operate represents a hybrid between surface and underground operations. Mine design must take into consideration the complexities associated

    Jan 1, 1993

  • SME-ICGCM
    Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivage

    By Nikolaos Polysos

    To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure

    Jan 1, 2002

  • SME-ICGCM
    Engineering Methods For The Design And Employment Of Wood Cribs

    By Thomas M. Barczak

    Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c

    Jan 1, 1993

  • SME-ICGCM
    Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt Mine

    By David B. Plumeau

    The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv

    Jan 1, 1981

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    Design Of A Roof Truss Bolting Plan For Bear Mine

    By C. P. Mangelsdorf

    Between June of 1975 and November of 1978 Stateham and Radcliffe of the Denver Research Center of the Bureau of Mines in cooperation with officials of the Bear Coal Company of Somerset. Colorado Condu

    Jan 1, 1984

  • SME-ICGCM
    Flexibolt Flexible Roof Bolts: A New Concept For Strata Control

    A high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m

    Jan 1, 1993

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U.S. Bureau of Mines to develop techniques that will reduce the hazards in the mining wo

    Jan 1, 2000

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    Changes In Seismic Measurements With Blast Induced Fracturing: A Field Experiment

    By Clifford J. Roblee

    In this paper, various seismic indicators are evaluated for ability to discern fractures induced into a rock mass by blasting. This is accomplished by presenting results from in situ crosshole seismic

    Jan 1, 1989