Search Documents

  • SME
    Fine Particle Process Control For Slurry

    By R. Owen

    The vision-based approach to process control involving fine particles in harsh on-line environments is discussed in this paper. The sensor equipment at the process location, consisting of a light so

    Jan 1, 2001

  • IIMP
    A robust water-balance method for sizing heap leach solution ponds and water reservoirs

    By James R. Kunkel

    The paper point out the use about of robust water-balance method for sizing heap leach solution ponds and water reservoirs. In this sense, using a robust water-balance method to size storage ponds and

    Sep 13, 2001

  • NIOSH
    The Principles And Practice Of Sampling Metallic Metallurgical Materials, With Special Reference To The Sampling Of Copper Bullion. - Introduction.

    By Edward Keller

    The work covered by this report was undertaken at the request of Dr. J. A. Holmes, late Director of the Bureau of Mines, to whom the writer had been recommended by C. W. Goodale and E. P. Mathewson, o

    Jan 1, 1916

  • SME-ICGCM
    Improving Design Methodology For Innovative Rock Mechanics Design

    By Dwayne C. Kicker

    This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a

    Jan 1, 1989

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SAIMM
    Analysis of rock avalanches generated by large planar rock slides by means of numerical methods for discontinua

    By R. Ribacchi, P. Tommasi, C. Consorti, P. Campedel

    The runout of dry blocky rock avalanches produced by planar rockslides affecting a limestone formation with clayey interbeds is analysed by means of distinct element modelling. Numerical analyses are

    Jan 1, 2003

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • TMS
    Carbon-thermal Reduction Process for making Al-Si Alloys from Al2O3-SiO2 Containing Industrial Wastes

    By Jilai Xue

    Industrial wastes containing 30-50 wt.% Al2O3 and 40-60 wt.% SiO2 may serve as an alternative resource for producing Al-Si alloys. Various raw materials such as used refractory materials from metallur

    Jan 1, 2010

  • AUSIMM
    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Sep 13, 2010

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • AUSIMM
    Confidence in Resource Estimates - Beyond Classification

    By C Moorhead

    The classification of Mineral Resource estimates for reporting in accordance with the JORC Code is a statement of the Competent PersonÆs confidence in the estimate and an attempt to convey that confid

    Jan 1, 2009

  • AUSIMM
    Contamination of Samples for Analysis When Using Ring Grinder Mills

    Ore samples generally require preparation before analysis. Serious problems can occur with contamination degradation and particle size effects. Both grinding element contammation and sample cross cont

    Jan 1, 1978

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • AUSIMM
    Study on Iron Ore Sintering with High Proportion of Specularite Concentrates

    Study on Iron Ore Sintering with High Proportion of Specularite Concentrates Specularite iron ores have poor hydrophilicity and ballability as well as bad high-temperature reactivity, which restricts

    Sep 13, 2010

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • SME
    Liner System Protects Oils Sands’ Tailings Area

    Syncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and

    Jan 1, 2000

  • AUSIMM
    Geology and Exploration at Puhipuhi, Northland, New Zealand

    By G J. Corbett, T M. Leach

    Approximately 42 t of mercury were produced from Puhipuhi from the late nineteenth century until the end of World War II, with no significant gold or silver production. Sinter, eruption breccias and v

    Jan 1, 1997

  • SME
    El Abra - Two Years Later

    By Rainer Kahrger

    This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli

    Jan 1, 1998

  • IOM3
    Sulphur isotope study of Ni-Fe-Cu mineralization in the Shetland ophiolite

    By R. A. Ixer, R. A. Lord, H. M. Prichard, A. J. Boyce, P. McConville, C. T. Pillinger, I. P. Wright, J. Maynard

    Analysis of 62 samples show that the sulphides throughout the igneous stratigraphy have a magmatic signature, with the exception of the uppermost gabbros and the lowermost basal thrust talc-carbonate

    Jun 19, 1905