Search Documents

  • IOM3
    Ore reserves: the mining aspects

    By H. K. Taylor

    Ore reserves are inadequately defined. Geological reconnaissance and pre-feasibility mining work generate a broad range of valid tonnage estimates, many published for the benefit of various interests,

    Sep 1, 1991

  • SME
    Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

    By Chris Bennett, Drupad Desai, Kirit Mevawala

    INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg

    Jan 1, 2005

  • AUSIMM
    Start-up of Misima Mines Milling Operation

    The physical setting and background to mining operations on Misima Island and the overall plant lay-out are outlined. Developments and changes made to each section of the plant are described as th

    Jan 1, 1991

  • AUSIMM
    Boring a Slime Dam

    By Met B

    IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum

    Jan 1, 1928

  • AUSIMM
    Management of Seismicity at the Beaconsfield Gold Mine, Tasmania

    By A R. Penney

    Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for

    Jan 1, 2008

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • AIME
  • AUSIMM
    Metallurgical Aspects of the Barrytown Mineral Sands Deposit

    This paper aims to collate the metallurgical test work undertaken on the Barrytown mineral sands deposit. It is intended to serve as a summary of mineral dressing work undertaken by all interested par

    Jan 1, 1989

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • SME
    Mining Foundation of the Southwest Honors its 2005 Inductees

    The 23rd annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Tucson Marriott University Park Hotel, Tucson, AZ on Saturday, Dec.

    Jan 1, 2005

  • AUSIMM
    Validation Test of Ground Control for a Vertical Rise

    Entry of personnel under a vertical raise bored hole is not standard practice in Australia. Where access is required below a rise, mining operations must be confident that they understand the capacity

    Nov 25, 2010

  • NIOSH
    OFR-13-82 Engineering Property Changes And Environmental Effects On Coal Mines Wastes Due To Slaking

    Fresh coal refuse was sampled at 21 US mines. Five of the sites were drilled, sampled and tested more extensively. Field tests included Standard Penetration tests, and in-situ density determinations.

    Jan 1, 1981

  • AUSIMM
    Use of Small-Scale Passive Systems for Treatment of Acid Mine Drainage

    By P Gunn, M Watts

    The general goal of passive acid mine drainage (AMD) treatment is to reduce levels of acidity and metals to acceptable levels. Most treatment systems use either an oxidising or a reducing strategy. In

    Jan 1, 2005

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • ISEE
    Journal: Blast Vibration and Seismograph Section / Accuracy of Blasting Seismographs

    By Bob Turnbull

    The International Society of Explosives Engineers (ISEE), at its 1995 annual conference, established a Seismograph Standards Working Group to develop performance standards for blast vibration seismogr

    Jan 1, 2007

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • AUSIMM
    Concentration of Silver-Lead Ores

    The following brief paper is intended, to apply to the concentration of the silver-lead ores at Broken Hill, New South Wales, generally, but more particularly to the process as applied to the ores in

    Jan 1, 1904

  • NIOSH
    IC 7293 Mining And Milling Operations Of The Rutile Mine Of The Titanium Alloy Co. Of Arkansas Hot Spring County, Ark. ? Summary

    By Felix A. Vogel

    Rutile concentrate, used in the manufacture of welding rode, smoke-screen chemicals, and alloys, is being produced by the Titanium Alloy Co. of Arkansas at its mine and. mill in Magnet Cove. The compa

    Jan 1, 1944

  • SME
    Challenges In Coal Mine Slope Construction

    By J. Haynes

    Coal mines in the eastern US often use sloped shafts as production beltways for ore removal, as means of access for supplies, and for ventilation. These structures are usually completed with the help

    Feb 27, 2013

  • SME
    Innovative Roof Support Systems For The Next Generation Of Mining

    By S. C. Tadolini

    Roof support systems have evolved from standing posts and timbers to a generation termed ?big nails? where steel bars are inserted into boreholes and anchored with expansion shells and/or resin cartri

    Jan 1, 2012