Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fine Particle Process Control For SlurryBy R. Owen
The vision-based approach to process control involving fine particles in harsh on-line environments is discussed in this paper. The sensor equipment at the process location, consisting of a light so
Jan 1, 2001
-
A robust water-balance method for sizing heap leach solution ponds and water reservoirsBy James R. Kunkel
The paper point out the use about of robust water-balance method for sizing heap leach solution ponds and water reservoirs. In this sense, using a robust water-balance method to size storage ponds and
Sep 13, 2001
-
The Principles And Practice Of Sampling Metallic Metallurgical Materials, With Special Reference To The Sampling Of Copper Bullion. - Introduction.By Edward Keller
The work covered by this report was undertaken at the request of Dr. J. A. Holmes, late Director of the Bureau of Mines, to whom the writer had been recommended by C. W. Goodale and E. P. Mathewson, o
Jan 1, 1916
-
Improving Design Methodology For Innovative Rock Mechanics DesignBy Dwayne C. Kicker
This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a
Jan 1, 1989
-
The Influence Of Massive Sandstones In The Main Roof On Longwall Support LoadingBy A. M. Richardson
The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d
Jan 1, 1996
-
Analysis of rock avalanches generated by large planar rock slides by means of numerical methods for discontinuaBy R. Ribacchi, P. Tommasi, C. Consorti, P. Campedel
The runout of dry blocky rock avalanches produced by planar rockslides affecting a limestone formation with clayey interbeds is analysed by means of distinct element modelling. Numerical analyses are
Jan 1, 2003
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Carbon-thermal Reduction Process for making Al-Si Alloys from Al2O3-SiO2 Containing Industrial WastesBy Jilai Xue
Industrial wastes containing 30-50 wt.% Al2O3 and 40-60 wt.% SiO2 may serve as an alternative resource for producing Al-Si alloys. Various raw materials such as used refractory materials from metallur
Jan 1, 2010
-
Microfluidic Solvent Extraction for Mineral Processing of Copper Leach SolutionsMicrofluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions
Sep 13, 2010
-
The Mount Kare Gold ProjectBy Caithness SJ, Heape JMT
Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and
Jan 1, 1991
-
Transforming Flow Sheet Design with Inert Grinding – the IsaMillBy K. E. Barnes
"The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin
Jan 1, 2006
-
Confidence in Resource Estimates - Beyond ClassificationBy C Moorhead
The classification of Mineral Resource estimates for reporting in accordance with the JORC Code is a statement of the Competent PersonÆs confidence in the estimate and an attempt to convey that confid
Jan 1, 2009
-
Contamination of Samples for Analysis When Using Ring Grinder MillsOre samples generally require preparation before analysis. Serious problems can occur with contamination degradation and particle size effects. Both grinding element contammation and sample cross cont
Jan 1, 1978
-
Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for SafetyBy G Baiden
The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them
May 9, 2016
-
Study on Iron Ore Sintering with High Proportion of Specularite ConcentratesStudy on Iron Ore Sintering with High Proportion of Specularite Concentrates Specularite iron ores have poor hydrophilicity and ballability as well as bad high-temperature reactivity, which restricts
Sep 13, 2010
-
Water Treatment at Waikato North Head Mine SiteBy B Orchard
New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.
Jan 1, 2002
-
Liner System Protects Oils Sands’ Tailings AreaSyncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and
Jan 1, 2000
-
Geology and Exploration at Puhipuhi, Northland, New ZealandBy G J. Corbett, T M. Leach
Approximately 42 t of mercury were produced from Puhipuhi from the late nineteenth century until the end of World War II, with no significant gold or silver production. Sinter, eruption breccias and v
Jan 1, 1997
-
El Abra - Two Years LaterBy Rainer Kahrger
This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli
Jan 1, 1998
-
Sulphur isotope study of Ni-Fe-Cu mineralization in the Shetland ophioliteBy R. A. Ixer, R. A. Lord, H. M. Prichard, A. J. Boyce, P. McConville, C. T. Pillinger, I. P. Wright, J. Maynard
Analysis of 62 samples show that the sulphides throughout the igneous stratigraphy have a magmatic signature, with the exception of the uppermost gabbros and the lowermost basal thrust talc-carbonate
Jun 19, 1905