Resource Estimation Practice, Macraes Gold ProjectBy M Stewart
In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt
Jan 1, 1997
-
Continuous Surface Mining of Medium - Hard MaterialsBy Halvorsen N
For mining medium-hard materials on the surface, "Continuous Surface Miners" have been employed for some years. The latest generation surface miner extends the performance of this type of machine t
Jan 1, 1990
-
The Application of Hedging in Mine FinanceFuture metal prices play a direct role in both the economic evaluation and short to medium planning of a mine scheduling sequence. It is difficult to predict with accuracy the future price of volatile
Jan 1, 1980
-
Twenty-five Years of Mine Filling: Developments and DirectionsThe sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part to
Jan 1, 1998
-
Maximising the Operational Benefit of Capital Investment Via Computer SimulationIn the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its
Jan 1, 1990
-
The Selection Design and Application of Mill Liners for Large Wet Grinding MillsBy C Thompson, D Connelly
The history of mill liners has evolved over time and this paper tracks the changes and development of liner technology. It provides an overview of the primary types of liners, the design and the mater
Jul 15, 2013
-
The Kiewa Hydro-Electric Scheme Special Reference to Tunnelling OperationsBy Knevitt L. T
PART 1Details of Kiewa Scheme.Introduction.Topography.Preliminary Investigations.Geology.Description of Project.Details of Main Works.Main Transmission of Power.Construction Facilities.PART 2Undergrou
Jan 1, 1950
-
The Application of Probabilistic Keyblock Methods for Support Design in Blocky Rock MassesSupport design in jointed or blocky rock masses is often approached by the use of either 'rules of thumb', rock mass classification systems such as the Q-system (Barton, Lien and Lunde, 1974
Nov 25, 2010
-
Local Resource Development Initiative - Developing a New Project Sustainability Model (Ambatovy Project Case Study)By S Novak
A world-class example of sustainable development in practice, the Local Resource Development Initiative (LRDI) grew from agreements between the Ambatovy nickel mine developers and the Government of Ma
Jan 1, 2009
-
Selective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation MethodSelective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation Method
Sep 13, 2010
-
Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust ControlBy H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim
An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi
Aug 24, 2015
-
Installations of the Computer at Mount IsaMount Isa Mines Limited first installed electronic data processing equipment in 1959. The decision to replace this equipment with a computer was motivated by the need for greater processing power and
Jan 1, 1968
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Blasting Logistics at Rio Tinto Coal Australia's Hail Creek MineIn March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline
Jan 1, 2007
-
Design of the Second Block Cave at Northparkes E26 MineThe pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur
Jan 1, 2001
-
Opportunities for the New Zealand Coal IndustryThank you for this opportunity to address your conference on 'The role of coal in the New Zealand energy market'. New Zealand's energy market has, in common with much of New Zealand, un
Jan 1, 1990
-
Keynote Address The Human Element in Apcom's DevelopmentIt is indeed a privilege and honour to deliver the keynote address at this 15th APCOM symposium. APCOM has played a significant role in my own career and I am sure in the careers of many of the th
Jan 1, 1977
-
Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failureBy J Lapwood, S Pal, M Pascoe
The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even
Jul 1, 2021
-
Magnetic Conditioning at the Hellyer Tailings Retreatment PlantBy B Lumsden
During periods of high metal prices and strong metal demand tailings retreatment can be economic. Most tailings retreatment operations are technically challenging, low margin operations, because the e
Jan 1, 2009
-
Using DEM to Model Industrial Banana ScreensUsing DEM to Model Industrial Banana Screens
Sep 13, 2010