Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Patron's Address

    I was delighted to be invited to be patron of this Joint Conference, but the challenging task you have set yourselves, and your speakers' depth of expertise, deny anyone, even the patron, the

    Jan 1, 1978

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine

    By C Woodall, G Jardine

    The Henty Gold Mine, located in Western Tasmania uses innovative solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several environm

    Jan 1, 1998

  • AUSIMM
    Integrated Mine Waste Management – South Deposit Tailings Storage Facility, Savage River Mine, Tasmania

    By A Simmons, R Longey, D Brett

    The South Deposit Tailings Storage Facility (SDTSF), located at Grange Resources Pty Ltd’s (Grange) Savage River mine in north west Tasmania, has recently begun construction. The facility will provide

    Jul 27, 2015

  • AUSIMM
    Using Positron Emission Particle Tracking (PEPT) to Investigate Industrial Systems

    Using Positron Emission Particle Tracking (PEPT) to Investigate Industrial Systems

    Sep 13, 2010

  • AUSIMM
    Hybrid Process Control Strategy for the Ok Tedi Mining Ltd Semi-Autogenous Grinding Mill #2 - A Comparative Analysis

    By G Metzner, R Rodriguez, C Savage

    OK Tedi Mining Ltd. (OTML) is in the process of optimising the concentrator performance. One aspect that has been recently implemented is an upgrade of the existing expert control philosophy on the gr

    Jul 15, 2013

  • AUSIMM
    Active and Passive Seismic Monitoring of Cave Front Evolution

    By R A. Lynch

    The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl

    May 9, 2016

  • AUSIMM
    The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II

    By Baker G

    The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then

    Jan 1, 1953

  • AUSIMM
    Paper No. 130. Gold Dredging in Otago.

    As the chief field of the gold dredging industry in Otago is the district traversed by the Molyneux River (called above Cromwell the Clutha) and its tributaries, a brief reference to the geology of th

    Jan 1, 1903

  • AUSIMM
    Renewed Exploration in Canada's Premier Iron Ore District - Labrador West

    By J OÆDriscoll, R Butler, L Winter

    The iron ore mining district of Labrador West and adjacent Quebec is Canada's largest iron ore producer with almost 50 years of production. The area is currently experiencing a period of renewed

    Jan 1, 2009

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    The basics of grinding circuit optimisation

    By A Giblett, B Putland

    This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be

    Aug 29, 2018

  • AUSIMM
    Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper Mine

    By B E. De Gee, N Viviers, A Naidoo

    In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio

    Sep 1, 2014

  • AUSIMM
    Using Independent System Simulation to Mitigate Risk in the Dalrymple Bay Coal Chain

    By B Olsson, B Reynolds, R Norman

    An unprecedented growth in demand for coal exports has placed pressure on multi-user coal chains to guarantee that their capacity expansion projects will meet the required demand. These projects, howe

    May 24, 2012

  • AUSIMM
    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding

    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa

    Sep 13, 2010

  • AUSIMM
    Admixture use in cemented rock fill

    By B Roache, J O’Brien, M Gray

    Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing

    Nov 29, 2022

  • AUSIMM
    Some Calculations Dealing with Mine Timber

    ONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated

    Jan 1, 1923

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015